Interrogation Site Metadata
MTP - Twisp Acclimation Pond
Status: Active - Non-OperationalGeneral Operational Period: Seasonally
Start Date: 3/26/2019 12:00 AM
Twisp Acclimation Pond is Douglas County PUD owned and WDFW operated. This pond is a man-made, remote acclimation pond located approximately 6 miles west of Twisp, WA. Acclimation of juvenile salmon at this site occur on a yearly basis and between March 1 and June 15, depending on species. The interrogation site is comprised of two IS1001 and one AllFlex detection systems installed within the outlet channel to the Twisp Acclimation Pond. The outlet channel is approximately 10 meters in length. Interrogation systems are installed just prior to release and are taken out when all hatchery juvenile fish have left the facility. The interrogation systems are intended to monitor in-pond and smolt-to-adult survival rates.
Current Operations
Last File Loaded: | MTP-2023-081-P-001.json |
Date Last File Loaded: | 5/31/2023 4:10 PM |
Date Last File Opened: | 3/22/2023 7:33 PM |
Date Last File Closed: | 5/5/2023 8:07 AM |
Last Observation Tag: | 3DD.003D8C0BFB |
Last Observation Date: | 5/5/2023 8:07 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 3/22/2023 7:33 PM | 5/5/2023 8:07 AM | Start and end dates based on file open and closed dates. |
2022 | 3/17/2022 1:33 AM | 5/26/2022 3:45 AM | Start and end dates based on file open and closed dates. |
2021 | 3/17/2021 12:00 AM | 5/13/2021 12:00 AM | Start and end dates based on timer tags. |
2020 | 4/17/2020 8:00 AM | 4/28/2020 12:00 PM | Start and end dates based on file open and close dates. |
2019 | 3/26/2019 12:00 AM | 5/9/2019 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Outlet Channel | A1 | A1 |
Outlet Channel | A2 | A2 |
Outlet Channel | B1 | B1 |
Outlet Channel | B2 | B2 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
6/21/2023 4:00:00 PM | General |
2023 Interrogation event log for the Twisp Acclimation Pond (MTP) Configuration 110 PIT tag interrogation (Antenna A1) for Twisp Acclimation Pond was installed on 03-29-2023 and removed on 05-09-2023. Antenna (A1) was located at the pond outlet opening in the outlet channel. PIT tag interrogation (Antenna B1) for Twisp Acclimation Pond was installed on 03-29-2023 and removed on 05-02-2023. Antenna B1 was located 5 meters downstream of the outlet. PIT tag interrogation (Antenna B2) for Twisp Acclimation Pond was installed on 03-29-2023 and removed on 04-25-2023. Antenna B1 was located 15 meters downstream of the outlet. PIT tag interrogation (Antenna A2) for Twisp Acclimation Pond was installed on 04-25-2023 and removed on 05-02-2023. Antenna (A2) was located at 25 meters downstream of the outlet. Antenna (A1), Antenna (B1), Antenna (B2), and Antenna (A2) downloads were combined into a single interrogation file. |
6/21/2022 5:13:00 PM | General |
Interrogation event log for the Twisp Acclimation Pond (MTP) - 2022 Release PIT tag interrogation system (Antenna A1) for Twisp Acclimation Pond began on 03-17-2022 at 0130 hrs. Antenna (A1) was located at the pond opening in the outlet channel. The last download for this antenna occurred on 05-11-2022 at 0035 hrs. PIT tag interrogation system (Antenna A3) for Twisp Acclimation Pond began on 04-25-2022 at 1020 hrs. Antenna (A3) was located 10 meters downstream of the pond outlet structure. The last download for this antenna occurred on 05-26-2022 at 0350 hrs. The Twisp Acclimation Pond was de-watered on 05-03-2022. Antenna (A2) and Antenna (A3) downloads were combined into a single interrogation file. |
7/14/2021 11:05:00 AM | General |
Interrogation event log for the Twisp River Acclimation Pond (MTP) - 2021 release PIT tag interrogation system (Antenna A2) for Twisp River Acclimation Pond began on 04-14-2021 at 1200 hrs. Antenna (A2) was located 10 meters downstream of the pond outlet structure. Antenna (A2) was never moved and did not experience any lapse in coverage. All downloads were incorporated into a single file. The last download for this antenna occurred on 04-04-2021 at 1200 hrs. The Twisp River Acclimation Pond was dewatered on 05-04-2021. |
6/30/2020 1:18:07 PM | SiteDown | Interrogation event log for the Twisp River Acclimation Pond (MTP) - 2020 release PIT tag interrogation system (Antenna A1) for Twisp River Acclimation Pond began on 04-17-2020 at 1000 hrs. Antenna (A1) was located 10 meters downstream of the pond outlet structure. Antenna (A1) was never moved and did not experience any lapse in coverage. All downloads were incorporated into a single file. The last download for this antenna occurred on 04-28-2020 at 1200 hrs. PIT tag interrogation system (Antenna A2) for Twisp River Acclimation Pond began on 04-17-2020 at 0800 hrs. Antenna (A2) was located approximately 10 meters downstream of Antenna (A1). Antenna (A2) was never moved and did not experience any lapse in coverage. All 2 downloads were incorporated into a single file. The last download for this antenna, occurred on 04-27-2020 at 1200 hrs. The Twisp River Acclimation Pond was dewatered on 04-21-2020, but the arrays were left in the outlet channel for a week after the end of release. |
7/29/2019 10:09:37 AM | General | Interrogation event log for the Twisp River Acclimation Pond (MTP) - 2019 release PIT tag interrogation system (Antenna A1) for Twisp River Acclimation Pond began on 03-26-2019 at 1015 hrs. Antenna (A1) was located 10 meters downstream of the pond outlet structure. Antenna (A1) was never moved and did not experience any lapse in coverage. All downloads were incorporated into a single file. The last download for this antenna occurred on 05-09-2019 at 1400 hrs. PIT tag interrogation system (Antenna A2) for Twisp River Acclimation Pond began on 04-16-2019 at 1600 hrs. Antenna (A2) was located approximately 10 meters downstream of Antenna (A1). Antenna (A2) was never moved and did not experience any lapse in coverage. All 4 downloads were incorporated into a single file. The last download for this antenna, occurred on 05-06-2019 at 1200 hrs. The Twisp River Acclimation Pond was dewatered on 05-01-2019, but the arrays were left in the outlet channel for a week after the end of release. |