Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

OMF - Omak Creek above Mission Falls

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Colville Confederated Tribes
General Operational Period: Year Round
Start Date: 3/3/2015 12:00 AM

OMF is a permanent PIT tag interrogation system located above Mission Falls in Omak Creek. Omak Creek enters the Okanogan River at RKM 51.5, approximately 1 KM upriver from the town of Omak, WA. The OMF site is located approximately 10.5 RKM upstream from the confluence of the Okanogan River. In March, 2015 the site consisted of a FS1001M running 4 pass-over PVC antennas, in two separate channel spanning rows. In March, 2018 the instream array was reconfigured with two 10 foot HDPE antennas anchored to the stream bed for pass-over detection. Antennas are arranged in a single row that spans the wetted width at base flow. Each antenna is power by a Biomark IS1001 reader multiplexed by an IS1001-MTS. Power is provided by a two 280 watt solar panels.

Current Operations

Last File Loaded: OMF-2024-106-P-001.json
Date Last File Loaded: 4/22/2024 4:10 PM
Date Last File Opened: 4/15/2024 8:59 AM
Date Last File Closed: 4/22/2024 5:59 AM
Last Observation Tag: 3DD.003D5284BA
Last Observation Date: 4/21/2024 11:54 PM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Randy Johnson
Randy.Johnson.FNW@colvilletribes.com
509-634-1030

Location

Coordinates: 48.370177, -119.434080  |  River Km: 858.052.012

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 3/14/2023 12:00 AM 11/2/2023 12:00 AM Start and end dates based on timer tags.
2022 3/7/2022 12:00 AM 10/26/2022 12:00 AM Start and end dates based on timer tags.
2021 3/2/2021 12:00 AM 11/2/2021 12:00 AM Start and end dates based on timer tags.
2020 3/4/2020 12:00 AM 11/16/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 3/19/2019 12:00 AM 6/27/2019 12:00 AM Start and end dates based on timer tags.
2018 4/17/2018 12:00 AM 12/11/2018 12:00 AM Start and end dates based on timer tags.
2017 3/23/2017 12:00 AM 10/18/2017 12:00 AM Start and end dates based on timer tags.
2016 2/29/2016 12:00 AM 11/18/2016 12:00 AM Start and end dates based on timer tags.
2015 3/3/2015 12:00 AM 11/24/2015 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  5/5/2020
End Date:  ----

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
3/13/2024 10:00:00 AM SiteUp

MC reinstalled and site activated. Updated firmware on all components. Both nodes appear to be in good order.

11/1/2023 2:34:00 PM SiteDown Site shut down for season.
3/14/2023 1:30:00 PM SiteUp

Installed MTS and tuned both nodes. Site activated and running for season.

10/25/2022 1:10:00 PM SiteDown

Site shut down for winter.

3/7/2022 10:15:00 AM SiteUp

MTS-MC reinstalled after being removed for winter. Site powered up and operating well.

11/1/2021 5:00:00 PM SiteDown

Site shut down for season. Solar cannot keep up with demand.

3/2/2021 10:00:00 AM SiteUp Site activated for season.
11/15/2020 8:29:00 AM SiteDown MC went to Standby due to low voltage. Site down for the rest of the season, solar cannot keep up.
11/10/2020 6:54:00 AM General MC went to Standby due to low voltage from 06:54 to 09:54 on 11/10/20, and then again from 17:54 until 09:22 on 11/14/20
11/9/2020 6:54:00 AM General MC went to Standby due to low voltage from 06:54 AM to 10:54 AM
9/30/2020 4:00:00 PM SiteUp Replaced canbus cable and power wires from solar panel to solar charge controller. Site back online.
9/8/2020 12:00:00 AM SiteDown Cold Springs Fire burned cabling from Solar Panel to Charge controller, and from MTS to ACN's. Site became inoperable.
3/4/2020 1:30:00 PM SiteUp Equipment reinstalled and site is back up and running.
7/18/2019 2:00:00 PM SiteDown Equipment was discovered stolen on July 18th. Last available data is from June 27th.
3/4/2019 12:00:00 PM SiteUp Site activated for the year. Solar is now able to keep up with power demands.
12/12/2018 3:48:00 PM SiteDown Site shut down for winter, solar could no longer meet power requirements.
3/27/2018 12:00:00 PM General Site reconfigured with one row of two 10 foot HDPE antennas anchored to the stream bed for pass-over detection.
3/15/2018 12:00:00 PM SiteUp Site activated, only antenna F4 is functional.
12/21/2017 12:00:00 PM SiteDown Site deactivated
3/27/2017 8:23:00 AM SiteUp Site activated, only antenna F4 is functional.
11/17/2016 11:00:00 AM SiteDown Download and removed system. Solar in 52.1v; out 22.6v.
11/9/2016 1:15:00 PM General Download. Solar in 61.1v; out 23.5v.
11/3/2016 1:00:00 PM General Download. Current good. Noise low. Solar in 62.2v; out 23.9v.
10/24/2016 7:00:00 AM General Download. Current good. Noise low. Solar in 64.2v; out 24.7v.
9/22/2016 10:30:00 AM General Download. All antennas 3-4 amps, 10-16% noise.

No Archived Event Logs