Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

Search by typing either a site name, site code, organization, or site type.

PEU - Upper Peshastin Creek

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 3/22/2016 12:00 AM

This is a permanent instream PIT tag interrogation site at rkm 17 on Peshastin Creek. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of two 10-foot PVC antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a QST QuBE ACN controller. The antennas were built and installed by WDFW. The site is powered by a thermoelectric generator. A cellular modem is installed on site to provide remote communication and allow for automated data collection. A submersible pressure transducer and temperature probes are installed on site to monitor environmental conditions.

Current Operations

Last File Loaded: PEU-2021-126-P-06A.xml
Date Last File Loaded: 6/24/2021 10:00 AM
Date Last File Opened: 5/6/2021 10:17 PM
Date Last File Closed: 6/1/2021 10:00 PM
Last Observation Tag: 3DD.003DA28837
Last Observation Date: 6/1/2021 8:27 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
509-664-3148

Data Steward:

Jay Deason
jay.deason@dfw.wa.gov
509-664-3148 x22

Location

Coordinates: 47.447973, -120.657430  |  River Km: 754.029.017

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2021
2020 2/1/2020 12:00 AM 5/25/2020 6:36 AM Start and end dates based on file open and close dates.
2019 1/1/2019 12:00 AM 7/3/2019 1:00 PM Start and end dates based on file open and close dates.
2018 1/13/2018 12:00 AM 12/19/2018 12:00 AM Start and end dates based on file open and close dates.
2017 1/1/2017 12:00 AM 11/26/2017 12:00 AM Start and end dates based on file open and close dates.
2016 3/22/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on file open and close dates.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/22/2016
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
4/27/2021 8:35:00 AM General Antennas 1 and 3 reported proper current levels again after cycling power to Qube several times.
3/29/2021 10:49:00 AM SiteUp Site turned back on for the season antennas 01 & 03 were not working.
11/12/2020 9:20:00 AM SiteDown Site was shut down for winter on November 12th 2020 due to problems with propane service and lack of fish movement. Will be turned back on by March 2021.
1/9/2020 11:00:00 AM General At interrogation site PEU on 1/09/2020 at approximately 11:00 AM, all antennas were manually checked with test tag. All antennas are functioning and read range is good.
5/31/2019 9:19:00 AM SiteUp On 5/31/19 Generator was restarted.
1/8/2018 8:31:00 AM General Fuel consumption rate has been increased at site resulting in stable current and noise values at ideal levels.
5/25/2016 1:00:00 PM General At interrogation site PEU, on 5/25/2016 at approximately 1:00 PM, Qube Time was changed to Pacific Standard Time.
5/3/2016 2:00:00 PM General At interrogation site PEU on 5/302016 at 2:00 PM, time on Qube was adjusted to Pacific Standard Time.
3/22/2016 11:30:00 AM SiteUp On 3/22/2016 at approximately 11:30 AM, interrogation site PEU was installed and is fully operational.

No Archived Event Logs