Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

RBF - Round Butte Fish Xfer Facility

Status:   Active - Operations Unspecified
Site Type: Instream Juvenile Fish Trap  |  Organization: Portland General Electric
General Operational Period: Year Round
Start Date: 3/11/2010 11:00 AM

Round Butte Dam Fish Transfer Facility

Current Operations

Last File Loaded: RBF-2024-114-P-010.json
Date Last File Loaded: 4/23/2024 8:03 PM
Date Last File Opened: 4/23/2024 4:59 PM
Date Last File Closed: 4/23/2024 7:00 PM
Last Observation Tag: 3DD.003D4DF574
Last Observation Date: 4/23/2024 4:54 AM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Rich Madden
rich.madden@pgn.com
541-325-5364

Location

Coordinates: 44.602185, -121.280384  |  River Km: 328.177

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 1/1/2011 12:00 AM 1/1/2012 12:00 AM
2010 3/11/2010 11:00 AM 1/1/2011 12:00 AM First year of operations.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/1/2009
End Date:  ----

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
1/22/2014 7:08:15 AM General The interogation site operated continuosly between January 1, 2013 and December 31, 2013. On November 1st 2013 the minimon stopped auto uploading data due to a hard drive glitch that caused the site to be down for a number of days. Data was uploaded manually.

Archived Event Logs