Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

S3A - Eagle Valley Ranch S3A

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Idaho Dept. of Fish and Game
General Operational Period: Year Round
Start Date: 10/1/2019 10:00 AM

This array is set up in a large engineered restoration project on Eagle valley Ranch. There are several anastamozed channels and more are planned in 2020. The array is at the outlet of a recently built channel near the bottom of subreach 3. Currently, there are two branches of the side channel that re-connect with the Lemhi upstream of this array, where fish can enter and leave the side channel without crossing the arrays S3A or S3B. The array is floating on the water surface, about 10-30 cm above the stream bed.

Current Operations

Last File Loaded: S3A-2022-132-P-01.xml
Date Last File Loaded: 7/14/2022 3:01 PM
Date Last File Opened: 5/12/2022 5:47 PM
Date Last File Closed: 7/6/2022 9:59 AM
Last Observation Tag: 3D9.1C2DEF885D
Last Observation Date: 7/5/2022 9:47 PM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Stacey Feeken
stacey.feeken@idfg.idaho.gov
208-756-2271

Location

Coordinates: 45.113170, -113.755600  |  River Km: 522.303.416.016

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023
2022 5/13/2022 12:00 AM 7/7/2022 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 12/31/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 10/1/2019 10:00 AM 1/1/2020 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  12/15/2019
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
2/20/2023 12:00:00 PM SiteUp

Reset breakers

7/5/2022 10:00:00 PM SiteDown

Reader breaker had went off.

5/14/2022 2:00:00 PM SiteUp

Site back up.

1/12/2022 2:00:00 PM SiteDown

Logger did not save files to drive. Files may be available locally on the reader hard drive.

1/14/2021 1:00:00 PM SiteUp site up
1/9/2021 11:00:00 AM SiteDown site down
12/20/2019 11:05:00 AM SiteUp Start of data collection

No Archived Event Logs