Interrogation Site Metadata

SA0 - Salmon Creek below OID Div.

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Colville Confederated Tribes
General Operational Period: Year Round
Start Date: 2/18/2016 12:00 AM
End Date: 11/16/2023 12:03 PM

Salmon Creek enters the Okanogan River at RKM 41.3, in the town of Okanogan, WA. The SA0 site is located approximately 6.35 KM upstream from the confluence of the Okanogan River. The setup consists of a two rows of flat plate antennas. The upstream row has three antennas, the downstream row has two antennas. The site will use a Destron Fearing FS1001M transceiver. The site will be on grid power. Site was removed November 2023 due to obsolete infrastructure and the installation of Salmon Creek PIT Array (SAD) about 2 rkm upstream.

Contacts

Data Steward:

Randy Johnson
Randy.Johnson.FNW@colvilletribes.com
509-634-1030

Location

Coordinates: 48.401726, -119.616082  |  River Km: 858.041.006

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2023 1/1/2023 12:00 AM 11/16/2023 12:03 PM SA0 was removed due to obsolete and degrading infrastructure (MUX). With the installation of the Salmon Creek PIT array SAD, located approximately 2 rkm upstream which detects adult returns above the diversion structure, this site was no longer a priority. SAD and SA0 ran congruently from 03/31/22 to 11/16/23. For detections downstream of the diversion, SA1 located at rkm 2 should be used.
2022 1/1/2022 12:00 AM 12/31/2022 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/9/2019 12:00 AM 12/3/2019 12:00 AM Start and end dates based on timer tags.
2018 3/18/2018 12:00 AM 12/20/2018 12:00 AM Start and end dates based on timer tags.
2017 2/7/2017 12:00 AM 12/15/2017 12:00 AM Start and end dates based on timer tags.
2016 2/18/2016 12:00 AM 12/9/2016 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/1/2016
End Date:  11/16/2023

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
11/16/2023 12:15:00 PM SiteDown

Replaced GFCI outlet to further troubleshoot power issues. New GFCI will not stay set while PIT interrogation equipment is plugged in. Likely that buried cable is the cause.

11/14/2023 10:00:00 AM SiteUp

Installed breaker between MUX and power supply to troubleshoot power issues. Reset GFCI. Site operational.

11/9/2023 10:00:00 PM SiteDown

Site down due to power failure

11/1/2023 1:30:00 PM SiteUp

Reset GFCI

8/25/2023 2:30:00 AM SiteDown

Site down due to power failure.

8/22/2023 12:15:00 PM SiteUp

Site back online. GFCI reset and disconnected modem to reduce power complications.

8/13/2023 6:00:00 AM SiteDown

Site down due to power failure.

8/10/2023 1:00:00 PM SiteUp

GFCI reset, power restored to site.

7/31/2023 5:30:00 AM SiteDown

Site down due to power failure

1/10/2023 12:00:00 PM General

Unique tag delay changed to 15 minutes.

12/7/2022 10:26:00 AM SiteUp

Data resumed being stored though due to reset, unique tag delay prevented storing tags already registered at site within last 5 detections.

11/1/2022 1:00:00 PM SiteDown

A data gap exists after this date/time due to a MUX reset and memory loss issue.

9/10/2022 10:30:00 AM SiteUp

End of data gap.

9/6/2022 3:00:00 PM SiteDown

Data gap between September 6th-10th due to memory being overwritten by lengthy download interval.

10/21/2021 8:00:00 AM SiteUp

Data back online

10/7/2021 11:00:00 AM SiteDown

Data gap starts

5/3/2021 3:30:00 PM SiteUp Replaced faulty MUX
4/26/2021 10:13:00 PM SiteDown MUX malfunctioned causing data loss from 4/26 at 22:13 until 5/3 at 15:30.
10/17/2017 12:00:00 PM SiteUp Site activated because stream flow was restored.
7/12/2017 12:00:00 PM SiteDown Site shut down because stream was dry.
7/19/2016 11:30:00 AM General Download. Swap switchers to use at BPC. System off for 45min at 1215.
6/21/2016 7:30:00 AM General Noise and amp issues with antennas. Antennas mostly dry. Retune all antennas.
6/16/2016 8:15:00 AM General Download. Could not communicate remotely. Poor signal. Move modem antenna.
4/26/2016 10:00:00 AM General Install new larger extension cord. Trenched. System ok.
4/18/2016 10:30:00 AM General Download. System ok. Low noise except antenna 4 (93%). Ghost tag on antenna 4 causing possible noise. Unique mode set to 15min until ghost tag flushes.

No Archived Event Logs