Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SAT - Lower Satus Creek

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Yakama Nation
General Operational Period: Year Round
Start Date: 1/5/2012 12:00 AM

SAT is a passive in-stream interrogation system consisting of one row of 3 antennas and a second row of 2 antennas spanning the width of Satus Creek. The site is located approximately 1700 meters upstream from the confluence of Satus Creek with the Yakima River. The location is 900 meters east and 500 meters north of the intersection of State Route 22 and Satus Longhouse Road in Yakima County, Washington, within the Yakama Reservation. Antennas and enclosures were built and installed by Yakama Nation staff. The antennas were secured to the substrate using MR4 anchors, NRS straps and ratchet straps. IS1001 readers were placed inside of submersible enclosures and anchored to the substate 6-8ft below each antenna. The IS1001 ACNs are daisy chained together with CAN bus and routed back to a metal job box where the IS1001 MTS is located. The site is powered by a 5060 TEG.

Current Operations

Last File Loaded: SAT-2024-117-P-002.json
Date Last File Loaded: 4/26/2024 12:10 PM
Date Last File Opened: 4/26/2024 8:10 AM
Date Last File Closed: 4/26/2024 8:10 AM
Last Observation Tag: 3DD.003DF4B446
Last Observation Date: 4/25/2024 8:45 PM
Detection Summary: Last Day's Observations

Contacts

Data Steward and Primary Contact:

Chris Frederiksen
chrisf@yakama.com
509-945-5018

Location

Coordinates: 46.275188, -120.137698  |  River Km: 539.112.005

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/14/2021 12:00 AM 7/27/2021 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 7/25/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM Start and end dates based on timer tags.
2014 1/13/2014 12:00 AM 1/1/2015 12:00 AM Start and end dates based on timer tags.
2013 1/2/2013 12:00 AM 12/16/2013 12:00 AM Start and end dates based on timer tags.
2012 1/5/2012 12:00 AM 1/1/2013 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  11/11/2019
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
5/18/2019 3:47:51 PM General On 5/18/19 around 3:30 PM, the thermoelectric generator ran out of propane and the site began to lose power. The site would remain down until 11/11/19 when the site was upgraded with IS1001 readers and transceiver.
6/21/2015 5:45:00 AM General Propane ran out sometime on 6/19. All power was finally lost to the site at this point. An event will be submitted when power is restored.

Archived Event Logs