Interrogation Site Metadata
SC3 - South Fork Clearwater Site 3
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 8/26/2021 12:00 AM
Lower, single array to help quantify passage near Milepost 28 on state highway 14. Array is located just upstream of Peasley Creek on the mainstem South Fork Clearwater River, Idaho.
Current Operations
Last File Loaded: | SC3-2024-113-P-005.json |
Date Last File Loaded: | 4/22/2024 10:40 PM |
Date Last File Opened: | 4/22/2024 5:23 PM |
Date Last File Closed: | 4/22/2024 9:19 PM |
Last Observation Tag: | 3DD.003DF846C8 |
Last Observation Date: | 4/22/2024 9:19 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/3/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 8/26/2021 12:00 AM | 12/28/2021 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Single Array | C0 | 01 |
Single Array | C0 | 02 |
Single Array | C0 | 03 |
Single Array | C0 | 04 |
Single Array | C0 | 05 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
1/30/2024 11:00:00 AM | SiteUp |
Site was turned back on. SC3 is operating continuously without disruption through February 6, 2024. |
1/25/2024 12:00:00 AM | SiteDown |
Site was turned off to conserve battery power. |
1/16/2024 12:00:00 PM | General |
Intermittent power outages during the night in December and early January. Solar panels found to be covered in ice and snow effectively draining three of four 12V batteries. Three new batteries installed and solar panels cleaned off. Site is operating continuously without disruption through January 19, 2023. |
7/31/2023 12:00:00 AM | GMC |
One of the 4 site batteries has failed and will be replaced in August 2023. SC3 is operating continuously without disruption through August 8, 2023. |
8/3/2022 1:00:00 PM | SiteUp |
Site is operating continuously without disruption through August 3, 2022. |