SFG - SF Salmon at Guard Station Br.

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 9/29/2009 12:00 PM

This is an in-stream interrogation system located at river km 30 near the lower South Fork Salmon River Guard Station on the South Fork Salmon River. The original configuration consisted of six flat plate antennas. Three antennas were added in September 2023 for a total of nine pass-over, in-stream antennas that span the width of the river. The original FS1001M transceiver was replaced with a Biomark IS1001-MC system in September 2023.

Current Operations

Last File Loaded: SFG-2024-116-P-003.json
Date Last File Loaded: 4/25/2024 11:03 PM
Date Last File Opened: 4/25/2024 6:02 PM
Date Last File Closed: 4/25/2024 9:02 PM
Last Observation Tag: 3DD.003BD46DD9
Last Observation Date: 4/25/2024 4:22 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Cameron Albee
camerona@nezperce.org
541-432-2503

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 45.175659, -115.579712  |  River Km: 522.303.215.030

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 4/4/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 6/30/2022 12:00 AM 11/29/2022 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 12/23/2021 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/24/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 12/31/2016 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 1/1/2011 12:00 AM 1/1/2012 12:00 AM Data from October 17-22 lost due to communication error.
2010 1/1/2010 12:00 AM 1/1/2011 12:00 AM
2009 9/29/2009 12:00 PM 1/1/2010 12:00 AM First year of operation. Due to problems with the MUX board, the site was operational for only 100 minutes between Oct. 11 13:04 and Oct. 16 10:37.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  9/15/2023
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
9/15/2023 2:57:00 PM General

The mux transceiver system was replaced with a Master Controller. Three additional antennas (A7 to A9) were added to complete the span across the river. New solar panels were added to improve power reliability.

9/15/2023 1:42:00 PM General

Antennas A7, A8 and A9 were installed on the week of 9/11-9/15. They are presently not activated. They will be activated when a new hybrid TEG is installed at the site. The TEG install is estimated to occur in October 2023.

4/4/2023 12:00:00 AM SiteUp

South Fork Salmon array (SFG) lost power on November 28, 2022.  A helicopter flight with two Biomark IPTDS specialists returned power to the site. Data collection resumed April 4, 2023.  

6/30/2022 12:00:00 AM SiteUp

Replaced dead batteries with four 115A batteries.  A short in the TEG ignitor cable likely caused TEG malfunction resulting in a loss of data collection.  SFG was up and running upon technician departure on June 30, however Satellite communications remain down thus data collection not uploaded through July 11, 2022

12/22/2021 11:15:00 AM SiteDown

Site down December 22, 2021 through June 30, 2022.  TEG malfunction caused 8 dead batteries and no data collection.

11/2/2021 12:00:00 AM General

SFG is operating continuously without disruption through 11/02/2021.  

9/16/2020 2:06:00 PM General South Fork Guard Station PIT array (SFG) MUX transceiver stopped functioning February 3, 2020 due to a faulty CPU board inside the MUX. The result was a loss of data collection until June 15, 2020 when the CPU board was replaced. SFG site is not accessible during winter because of deep snow. Antenna A4 stopped functioning in early February and was replaced with a Biomark PVC antenna on September 16, 2020. The site is running continuously without disruption through September 21, 2020.
10/17/2019 8:40:00 AM General SFG antenna A3 started losing current on 11/12/18 and continued to operate at 1.0 Amps. A3 was replaced on 10/17/19 with a 20 ft. Biomark antenna. SFG is running continuously without disruption through October 21, 2019.
8/12/2017 8:04:00 AM General South Fork Salmon (SFG) antenna A5 lost current during 2017 spring run off because the antenna cable was pulled out of the antenna. The cable was plugged back in and armored with large substrate. A5 is now operating. Antenna A2 also lost current due to a leak inside the antenna and was replaced with a new 20 ft. PVC antenna. SFG has run continuously without disruption through 8/15/17.
9/26/2016 8:37:00 AM General SFG Antenna A5 lost current 1/29/16. A5 was replaced with a 20 ft. Biomark antenna on 9/26/16. SFG has been operating without disruption through 11/2/16.
9/23/2014 11:45:00 AM General South Fork Salmon Guard station (SFG) is functioning and operational without disruption through 9/23/14
8/14/2014 11:45:00 AM SiteUp South Fork Salmon Guard station (SFG) antenna 1 (A1) began losing current 11/7/2013.  A1 never ceased to function, although read range integrity was reduced.  A1 was replaced with a 20 ft. Biomark lite style of antenna.  Batteries charged by solar were also replaced. Repairs were made to onshore equipment that was destroyed by the fallen tree.
8/12/2014 11:45:00 AM SiteDown South Fork Salmon Guard station (SFG) site went down due to a tree falling on top of all electrical equipment onshore.  
10/23/2013 9:48:51 AM General The site has been running continuously without disruption through 10/23/13. No new maintenance was performed.