Interrogation Site Metadata
SHP - Swift Hydroelectric Project
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 10/22/2016 12:00 AM
Fish enter the facility via a floating surface collector where they are sorted by size. Juvenile fish are either shunted directly to a holding tank to await transport downstream of Merwin Dam or they are sent to a sampling table where they are examined, possibly tagged, and sorted to either upstream of the Swift reservoir or downstream of Merwin Dam. All fish diverted to either tank pass through a PIT tag detector. There are two identical holding and sampling areas on the collector in which fish can travel. These areas are referred to the Port Side and Starboard Side. The port antenna was identified as 01 and the starboard antenna was 02. In February 2018 a third antenna was installed just above the sorting rack with an antenna ID of 01, and the port and starboard antennas were changed to 03 and 02, respectively.
Current Operations
Last File Loaded: | SHP-2024-115-P-010.json |
Date Last File Loaded: | 4/25/2024 5:41 AM |
Date Last File Opened: | 4/24/2024 11:57 PM |
Date Last File Closed: | 4/25/2024 3:57 AM |
Last Observation Tag: | 3DD.0078C6E2E2 |
Last Observation Date: | 4/25/2024 1:35 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 2/6/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 11/15/2018 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 10/22/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Sorting Rack Antenna | 01 | 01 |
Starboard Smolt Flume Antenna | 02 | 02 |
Port Smolt Flume Antenna | 03 | 03 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
3/1/2019 11:00:00 AM | General | New port side smolt flume antenna installed and operational. New antenna is a shielded fully enclosed 10"x10" box flume immediately downstream of the sorting rack on the port side. |
2/8/2018 10:15:00 AM | General | An antenna was add to the sorting rack upstream of the smolt flume antennas. A new site configuration has been submitted. The smolt flume antennas were previously incorrectly identified. |
10/15/2017 12:41:00 PM | SiteUp | FSC turned on following annual maintenance. |
8/1/2017 12:41:00 PM | SiteDown | FSC turned off for annual maintenace. |
10/10/2016 12:41:00 PM | SiteUp | FSC turned on following annual maintenance.. |
8/1/2016 12:41:00 PM | SiteDown | FSC shut down for annual maintenance. |