Interrogation Site Metadata
TR2 - Trout/Antelope Cr - Deschutes
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 1/1/2013 12:00 AM
Trout and Antelope Creek PIT tag array is located at RKM 20.7 upstream from the confluence with the Deschutes River on privately owned land. This site consists of six 20ft long lay flat antennas. The antennas are orientated with 3 antennas in Trout Creek and 3 antennas in Antelope Creek. In each creek the antennas are staggered in the active channel about 10 feet apart to ascertain directionality of fish. Antenna number 1 is the furthest upstream antenna and number 3 the bottom antenna on Trout Creek. On Antelope Creek the upstream antenna is number 4 and the downstream is number 6.
Current Operations
Last File Loaded: | TR2-2023-111-P-004.json |
Date Last File Loaded: | 1/17/2024 12:05 PM |
Date Last File Opened: | 4/21/2023 10:48 PM |
Date Last File Closed: | 4/21/2023 10:48 PM |
Last Observation Tag: | 3DD.003E1AF8D2 |
Last Observation Date: | 4/21/2023 10:48 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 3/31/2023 9:44 PM | 4/21/2023 10:48 PM | Start and end dates based on file open and closed dates. |
2022 | 1/1/2022 12:00 AM | 3/22/2022 3:50 PM | Start and end dates based on file open and closed dates. |
2021 | No data received for 2021 | ||
2020 | 1/1/2020 10:52 AM | 4/14/2020 10:52 AM | Start and end dates based on file open and close dates. |
2019 | 1/2/2019 3:00 PM | 3/25/2019 3:00 PM | Start and end dates based on file open and close dates. |
2018 | 1/1/2018 12:00 AM | Site down from July 9 - | |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Site down from July 6 - November 29 because the creek was dry. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Site down from June 22 - November 29 because the creek was dry. |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | File gap indicates the site was down from June 2 - September 1. |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | Site down from June 22 - December 4 (based on file gap) because the creek was dry. |
2013 | 1/1/2013 12:00 AM | 1/1/2014 12:00 AM | Site down June 10 - December 1 because the creek was dry. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Trout C. Array | F0 | F1 |
Trout C. Array | F0 | F2 |
Trout C. Array | F0 | F3 |
Antelop C. Array | F0 | F4 |
Antelop C. Array | F0 | F5 |
Antelop C. Array | F0 | F6 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
10/14/2022 9:41:00 AM | SiteUp | During periods of extreme high temperatures site is shut down |
7/9/2018 11:32:00 AM | SiteDown | Very High air temperatures and low water conditions |
11/2/2017 11:16:00 AM | SiteUp | Water flow on Antelope Creek. Trout Creek still intermittent. |
7/6/2017 11:16:00 AM | SiteDown | No water at site. |
11/29/2016 8:32:00 AM | SiteUp | Station brought back online. Still little water if any water in either Trout Creek or Antelope Creek. |
6/22/2016 8:32:00 AM | SiteDown | Little water if any water and very high air temperatures resulted in station shut down to preserve electronic components |
8/25/2014 3:00:00 PM | General | Registered new interrogation site TR2 |
6/29/2014 5:16:00 PM | SiteDown | no flow again |
12/1/2013 5:16:00 PM | SiteUp | water flows again |
6/10/2013 5:16:00 PM | SiteDown | No flow |
1/1/2013 5:16:00 PM | SiteUp | New site up and operational |