Instream detection array near the upper Grande Ronde weir at Starkey, consisting of a IS1001-MTS multiplexing receiver and eight antennas, each with 24v IS1001s. Antenna arrays consist of eight antennas that span the normal high water mark and are secured to the substrate for pass-over detection. Three antennas are placed side-by-side to span the creek for the upstream two arrays, and two antennas are placed side-by-side to span the creek for the downstream most array. This provides three separate arrays of coverage. Site is grid powered and operates year-round. Site is on private land.

Current Operations

Last File Loaded: UGS-2024-094-P-001.json
Date Last File Loaded: 4/19/2024 1:50 PM
Date Last File Opened: 4/3/2024 11:41 AM
Date Last File Closed: 4/19/2024 7:41 AM
Last Observation Tag: 3DD.003E24FF71
Last Observation Date: 4/19/2024 3:45 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Joseph Feldhaus
joseph.feldhaus@odfw.oregon.gov
541-962-3724

Data Steward:

Derrek Faber
Derrek.M.FABER@odfw.oregon.gov
541-296-8026

Location

Coordinates: 45.248955, -118.388958  |  River Km: 522.271.291

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 12/27/2021 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 12/2/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/11/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 12/18/2018 12:00 AM Start and end dates based on timer tags.
2017 11/3/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/14/2022
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
10/9/2023 10:00:00 AM GMC

Site visit for moving the modem into a new plastic enclosure to hopefully ensure a more reliable remote data connection. Once everything was moved and wires were reconnected, the site was powered back on. 

9/19/2023 3:00:00 PM GMC

We had continued to have intermittent connection using an older cell antenna. We replaced the directional antenna with an omnidirectional antenna that has more gain. We'll continue to monitor connection issues and make adjustments in the future if needed. 

 

8/2/2023 2:04:00 PM SiteUp

We completed a site overhaul on UGS this week. We installed all new CANBUS cabling, new underwater housings, pvc conduit, new junction boxes, and increased the height on the cell antenna. The antennas themselves are in great shape, but replaced all of the underwater housings for the IS1001 boards. We dug new trenches and placed new 3" PVC piping to provide protection for the cabling and ease any replacements in the future. Additionally, each array now has its own junction box to assist in diagnosing future problems. The system was turned on and fully tuned this week. 

We are still having some difficulty with the remote uploads as cell service continues to be intermittent. 

4/10/2023 3:00:00 PM SiteDown

Site visit to replace the two downstream nodes with the new nodes. We connected the nodes and the system was still shorting out (eliminating the nodes as the source of the short). We replaced the middle array trunk with new CANBUS from the first junction box back to the MC. The short remains leading us to believe the issue is buried in the river at one of the junction boxes. We attempted to swap the potentially flooded node (node 3) on the upstream array, but due to high water and low visibility we were unable to reach the node and remove it. 

 

4/7/2023 1:00:00 PM SiteDown

The ice has finally melted out. This is the current status of the UGS site"

Downstream Array: There is a short in the grounding wire somewhere between the first junction box (buried under the antenna in the river) and the second antenna. Both nodes were removed and cut open to check for flooding (both were dry). Nodes were replaced with new housing and new boards. 

Middle Array: There is a short in the trunk and all nodes were checked for flooding. Since all nodes were disconnected the short is somewhere within the CANBUS or buried junction boxes. 

Upstream Array: The CANBUS is in good condition with no shorts. Node 3 is hooked up, but not connecting. It is possible the node is flooded. Node 2 also does not connect, but had previously connected when using a different CANBUS connection. There is likely a short somewhere between the junction box and node 2. 

3/10/2023 4:00:00 PM SiteDown

UGS went down. There is a short in the downstream trunk, which is mostly encased in ice at the moment. Warm weather this week should melt out most of the ice to allow inspection of the cable. 

3/7/2023 1:00:00 PM SiteUp

UGS is back up, albeit with one antenna (7) currently working. The site had previously continued to go down due to a short in the grounding wires within the CANBUS. I'll be checking the site in 24hrs to see if it still up after fixes were made today. Ice continues to hamper efforts with the rest of the antennas. There is currently 8-10in of clear ice, 1-3in of cloudy ice, and 1-2in of snow on top of that. The river has continued to open up and hopefully with a round of warm weather forecasted we'll be able to better access the site next week. 

2/10/2023 2:00:00 PM SiteUp

Site back up. Antenna 3 is offline, possibly disconnected due to shifting ice on the river. Node 7 received a firmware update, then tuned and is back up and running. 

2/2/2023 7:00:00 PM SiteDown

Site down - cause unknown. 

2/1/2023 1:00:00 PM GMC

Site visit to download and continue making repairs. Data was downloaded upon arrival before we turned off power to the site. We reconnected the downstream array trunk to check for shorts. There were no shorts and began working to remove ice to reconnect the antenna that is currently covering the open water. The antenna was successfully connected and tuned. Power was turned off once again as we tied together the upstream and downstream trunks. Site was powered back up with antenna 3 and 7 operational. Data was uploaded once back at the office. 

1/26/2023 1:00:00 PM GMC

Site visit to perform maintenance. Upstream array currently has 1 working antenna (of two). The middle array is down. Downstream array had wire corrosion over approximately 25ft of CANBUS. We cut out the the corroded cable and replaced with new CANBUS. We ran out of daylight to finish the work to bring the downstream array back online. Next site visit will occur once weather clears up next week. 

10/31/2022 1:00:00 PM GMC

Site check to download data and check on the antennas. MC firmware was updated and antennas were reset following the update. Antennas 7 & 8 have shorted out, have not found where the short is coming from. Antenna's 2,3,7, and 8 are currently disconnected from the system. Antenna's 4,5, and 6 are up and working. 

10/21/2022 10:00:00 AM SiteUp

Today I went up and replaced the master controller that wasn't working with a new one. Plugged in and hooked up the new master controller, set the Serial #'s for the nodes on the working antennas, and tuned the system. We are back to five worked antennas (4-8) and two antennas are disconnected due to a short (2-3). I will be heading back early next week to place a backup thumb drive into the MC and check on the system. I will also take another look at the two upstream antennas to see if I can diagnose where the problem is. 

8/15/2022 12:00:00 PM SiteDown

Conducted a site visit this morning to check on the UGS array. Previously, we had the 2 upstream antennas short out so we disconnected them until flows receded in order to determine what was going on with them. The antennas looked to be in good working order and cables were in good condition. After opening up the control box housing the MC, I discovered that the system was offline. There is still power in the box, but the MC is not getting power or has been shorted. I'll be working to diagnose the problem and get UGS back up and running soon as I can. 

 

Update 8-17-22:

I was able to recover data off our backup USB drive. The array was working through 7pm on July 20th, 2022. Antenna 8 exceeded 10.0A and VTT tests were failing for all antennas operating.  

4/29/2022 1:00:00 PM SiteUp

UGS now has 5 of 7 antennas working (Antennas 4,5,6,7, and 8). Upstream antennas (2 &3) will be down until flows come back down and we can access them to determine if a node is flooded or another issue with the cabling. Data was downloaded and uploaded to ptagis. 

4/9/2022 8:52:00 AM SiteDown

Little over half of the UGS antenna site went down with 3 of the 7 antennas remaining working (middle array continued working, upstream/downstream went down). Antennas 7 & 8 went down on April 7th while antennas 2 &3 went down on April 9th. The reason for the antennas going down is believed to be a flooded node on one of the upstream arrays. At this moment, we are unable to get in the river to determine the cause of the short. 

3/18/2022 10:00:00 AM General

Checked to make sure all the antennas were up and running. Downloaded data to be uploaded to ptagis.

1/13/2022 1:56:00 PM SiteUp

Remote connection to UGS re-established. Manual data download at site to retrieve tags since 12/21/21. 

12/21/2021 11:00:00 PM SiteDown

Remote connection lost with UGS

11/9/2021 4:14:00 PM General

Site visit to download data.  We also re-secured antennas 2 and 3 to the stream bottom.  Antenna 1, a 10 foot antenna, was removed from the site because it was non-functional and was only covered by water for brief periods of time in the spring during high flow events.  

10/26/2021 1:00:00 PM GMC

Replaced the node for antenna 2.  The node for antenna 1 is still missing.  Antennas 2 - 8 are functional.

8/31/2021 6:00:00 PM SiteUp

Site apparently was not recording any data between 7/6 - 8/31, reason for this is unclear. 

7/6/2021 5:00:00 AM SiteDown

Site apparently was not recording any data between 7/6 - 8/31, reason for this is unclear.

4/13/2021 11:26:14 AM General The site has been downloaded frequently in April. As of January, nodes 1 and 2 are not operational. Nodes 3-8 are still attached and reading. Plans to repair the nodes are in place for when the water levels drop.
8/7/2020 3:00:00 PM General Repaired damaged cables leading to upstream (antennas 1-3) and downstream (antennas 7-8) arrays. Antennas 3, 7, and 8 are now back online; antennas 1 and 2 are still offline.