Interrogation Site Metadata
UMW - Umatilla R Recycled Water Fac
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 1/9/2018 12:00 AM
UMW is an instream detection array in the Umatilla River adjacent to the City of Hermiston’s Recycled Water Plant. One row of three antennas are laid in a pass over orientation, covering most of the wetted width of the river at base flows. In August of 2022, antenna 4 was moved to the antenna 1 spot and antennas 3 and 4 were replaced with newly built antennas. The antenna 2 spot was not replaced and is now empty. Each antenna has a submerged IS1001 node which are connected to an onshore IS1001-MC. The site is grid powered and operates year-round.
Current Operations
Last File Loaded: | UMW-2023-148-P-001.json |
Date Last File Loaded: | 5/28/2023 7:03 PM |
Date Last File Opened: | 5/27/2023 11:00 PM |
Date Last File Closed: | 5/28/2023 5:59 PM |
Last Observation Tag: | 3D9.1C2CFE249A |
Last Observation Date: | 5/28/2023 5:37 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2023 | |||
2022 | 6/6/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 5/31/2021 12:00 AM | 7/23/2021 12:00 AM | Start and end dates based on timer tags. |
2020 | 2/7/2020 12:00 AM | 5/21/2020 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 9/26/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/9/2018 12:00 AM | 12/28/2018 12:00 AM | Site down February 8 - June 12. Only antenna 4 operational after December 10. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Streamwidth array | 01 | 01 |
Streamwidth array | 01 | 03 |
Streamwidth array | 01 | 04 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
8/10/2022 1:00:00 PM | SiteUp |
Antennas 1,3 and 4 back up and running. Antenna 2 spot still empty. |
8/1/2022 10:00:00 AM | SiteDown |
Site shut down for repairs on 8/1/2022. Broken antennas 1 and 4 were removed and operating antenna 3 was moved to the antenna 1 spot (far river left). Antennas 3 and 4 were replaced with newly built antennas. Antenna 2 spot is empty. |
5/21/2020 12:36:00 AM | General | Antenna 1 cable failure. Antenna 1 is no longer operating. The only remaining operational antenna is antenna 3. |
9/12/2019 11:36:00 AM | SiteUp | Cables repaired. Antenna coils 01 and 03 operational. Antennas 02 and 04 are still down. |
4/19/2019 2:33:00 PM | SiteDown | Cable failure, no antenna coils are operational |
12/10/2018 1:40:00 PM | General | Only antenna 4 attached and operational. |
6/12/2018 11:17:00 AM | SiteUp | Antenna cable replaced, site up. |
2/8/2018 12:07:00 PM | SiteDown | Site down sometime between 2/8/2018 12:07 and 18:06 |
1/9/2018 1:49:00 PM | SiteUp | Site begins operation |