Interrogation Site Metadata
WR1 - Wallowa River at river km 14
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 1/1/2014 12:00 AM
WR1 is an in-stream detection system consisting of a single array located in the Wallowa River, Oregon. The array is located at river km 522.271.131.014 (N 45.633769 ° W -117.73369°) and consists of six 20 foot Biomark flat panel antennas. The array spans all but 20 feet of the river at base flow. WR1 is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Nez Perce Tribe Fisheries and Quantitative Consultants, Inc. and was installed for continuous monitoring on August 16, 2013. The array includes ISEMP standard site monitoring equipment including: air and water temperature probes, and a water pressure transducer to monitor stream level. Electrical power is provided by a thermal electric generator. Remote communication is provided by a satellite phone modem. Data collection started on August 16, 2013.
Current Operations
Last File Loaded: | WR1-2023-148-P-006.json |
Date Last File Loaded: | 5/29/2023 2:40 AM |
Date Last File Opened: | 5/28/2023 9:23 PM |
Date Last File Closed: | 5/29/2023 12:23 AM |
Last Observation Tag: | 3DD.003D494D4D |
Last Observation Date: | 5/28/2023 11:22 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2023 | |||
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 12/22/2018 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | |
2013 | No data received in 2013. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Left Bank | A0 | A1 |
Mid-Left | A0 | A2 |
Left Center | A0 | A3 |
Right Center | A0 | A4 |
Mid-Right | A0 | A5 |
Right Bank | A0 | A6 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
7/8/2022 12:00:00 AM | SiteUp |
Replaced TEG at site. Site up and running continuously through July 11, 2022. |
7/3/2022 12:00:00 PM | SiteDown |
The site TEG malfunctioned and ceased operations on July 3, 2022. |
6/3/2022 12:00:00 AM | SiteUp |
A severe thunderstorm extinguished the thermoelectric generator flame on June 3, 2022. Site TEG was restarted on June 6, 2022 resuming normal operations at WR1. |
11/2/2021 12:00:00 AM | General |
WR1 antenna A5 lost current on June 22, 2021. A5 has not been replaced to date. WR1 is operating continuously without disruption through November 2, 2021. |
6/16/2020 8:20:00 AM | General | Satellite SIM Card swapped, site visit. General clean up and maintenance performed. Brush and trees removed from antenna area. |
9/7/2019 4:57:00 PM | General | WR1 is operating continuously without disruption through October 9, 2019. |
11/19/2018 7:16:00 AM | General | Wallowa River 1 (WR1) had Campbell Scientific data logger replaced with a new data logger designed by Biomark on November 19, 2018. A new HughesNet satellite modem/antenna was also installed. WR1 site air temperature probe was changed out for a compatible model. WR1 is operating continuously without disruption through November 26, 2018. |
10/22/2018 7:10:00 AM | General | Wallowa River Array (WR1) is operating continuously without disruption through October 21, 2018. |
9/25/2018 7:10:00 AM | General | Wallowa River Array (WR1) antennas A5 and A6 front leading edge of fiberglass channeling had partiially eroded away from bedload moving past the array during spring flows. Aluminium angle shields were installed on the leading or upstream edge of the fiberglass channeling on antennas A5 and A6. |
7/6/2018 2:11:00 PM | SiteUp | Wallowa River Array (WR1) ran out of propane on 7/3/18 and did not operate through 7/6/18 12:30. |
5/25/2018 7:42:00 AM | SiteDown | Wallowa River 1 (WR1) Thermo electric generator flame was extinguished by thunderstorms at approximately 8:00 PM Friday May 25. WR1 TEG was restarted and normal operations resumed on May 29 11:00 AM. |
7/18/2017 8:03:00 AM | General | Wallowa River 1 (WR1) Thermo electric genertor (TEG) began to intermittently supply less than ample voltage beginning 7/14/17. The site was shut down between 9:30 AM and 12:00PM on 7/18/17 to thoroughly clean the TEG. WR1 has run continuously without disruption through 7/18/17. |
11/16/2016 9:08:00 AM | General | Wallowa River 1 (WR1) is functioning and operational without disruption through 11/16/16. |
9/23/2014 10:44:58 AM | General | Wallowa River 1 (WR1) is functioning and operational without disruption through 9/23/14. |
1/9/2014 9:21:00 AM | General | Remote communications are functioning. The site is running continuously without disruption. |
1/7/2014 9:21:00 AM | General | Installed a new satellite modem. |
11/15/2013 3:06:17 PM | General | Interrogation site WR1 registered in PTAGIS. |
9/20/2013 9:21:00 AM | General | Thermoelectric generator (TEG) was removed on 9/13/13 and replaced with a new TEG on 9/20/13 resulting in no data collection for 7 days. |
9/13/2013 2:00:00 PM | General | The thermoelectric generator (TEG) was replaced with another TEG. This site has been running continuously without disruption. |
8/27/2013 2:00:00 PM | General | The thermoelectric generator (TEG) stopped functioning 8/26/13. The TEG was restarted on 8/27/13 resulting in no data collection for 21 hours. |