Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

JO2 - John Day North Fish Ladder

Status:   Active - Operational
Site Type: Adult Fishway  |  Organization: Pacific States Marine Fisheries Commission
General Operational Period: Year Round
Start Date: 2/14/2018 11:30 AM

This site monitors the north fish ladder at John day dam with antennas installed in the weir orifices and overflows of two weir walls. The antennas were installed February 2017 without dedicated communication and synchronization lines. Only the upstream weir antennas were active for the first year. During that time PIT tag detections were stored to the transceiver buffers and then submitted to PTAGIS as passive recaptures. The site became fully operational and began automated data submissions of interrogation data on February 14, 2018.

Current Operations

Last File Loaded: JO2-2024-136-P-012.json
Date Last File Loaded: 5/15/2024 1:02 PM
Date Last File Opened: 5/15/2024 11:00 AM
Date Last File Closed: 5/15/2024 12:00 PM
Last Observation Tag: 3DD.003DA05F4A
Last Observation Date: 5/15/2024 11:57 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Don Warf
dlwarf@psmfc.org
509-735-2773

Data Steward:

Nicole Tancreto
ntancreto@psmfc.org
503-595-3141

Location

Coordinates: 45.718658, -120.697771  |  River Km: 347

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/12/2023 11:00 AM 1/1/2024 12:00 AM
2022 3/10/2022 9:00 AM 12/1/2022 9:00 AM
2021 1/15/2021 11:00 AM 12/6/2021 12:00 PM
2020 1/22/2020 12:00 AM 12/7/2020 12:00 AM
2019 1/17/2019 4:30 PM 12/10/2019 10:00 AM
2018 2/14/2018 11:30 AM 12/4/2018 12:00 AM Automated data submissions started Feb 14. Prior to this one weir wall was collecting detections to transceiver buffers, which were downloaded weekly and submitted as Passive Recaptures.
2017 Construction and installation of antennas was completed before all necessary communication and wiring was installed. Antennas on one weir wall were run and collected detections to transceiver buffers which were downloaded approximately weekly. These detections were submitted as Passive Recaptures from site JDALD2.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/27/2017
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
5/12/2024 11:14:11 AM ErrorsCleared Short noise event.
5/11/2024 9:08:20 AM ErrorsCleared Short noise event.
5/6/2024 12:48:23 PM ErrorsCleared Short noise event.
5/4/2024 7:00:32 AM ErrorsCleared Short noise event.
4/15/2024 7:10:30 AM ErrorsCleared Short noise event.
4/10/2024 11:15:00 AM GMC

Checked and tuned transceivers. No issues were discovered during this check.

4/2/2024 7:09:45 AM ErrorsCleared Short noise event.
3/27/2024 3:48:00 PM GMC

Performed site GMC, no problems to report

3/12/2024 7:12:22 AM ErrorsCleared Short noise event.
3/9/2024 11:02:29 AM ErrorsCleared No noise of concern was captured on the noise report
2/24/2024 7:37:19 AM ErrorsCleared Short noise event.
1/12/2024 6:58:53 AM ErrorsCleared Short noise event.
12/15/2023 8:57:00 AM General

All transceiver buffers were cleared the week of 12/11/2023.

12/12/2023 7:53:02 AM ErrorsCleared Noted.
11/13/2023 8:12:00 AM General

The annual Windows 10 LTSC updates were completed last Tuesday, Nov. 7 along with the upgrade of M5 to 2.1.8 . All site DCP's , SByC and non , now run the same version of M5. No outstanding issues to report.

11/9/2023 11:00:00 AM General

No secondary observations occurred during the 2 file gaps on 11/7/2023

JO2-2023-311-P-010  09:47:23 - 09:49:44
JO2-2023-311-P-013  11:25:06 - 11:29:25

10/21/2023 7:34:18 AM ErrorsCleared Noted.
10/21/2023 7:34:04 AM ErrorsCleared Short noise event.
10/19/2023 9:25:16 AM ErrorsCleared Short noise event.
10/17/2023 7:19:22 AM ErrorsCleared Short noise event.
10/11/2023 7:15:19 AM ErrorsCleared Short noise event.Noted
10/9/2023 7:52:51 AM ErrorsCleared Short noise event.
10/8/2023 7:04:31 AM ErrorsCleared Short noise event.
10/7/2023 7:43:15 AM ErrorsCleared Short noise event.
10/2/2023 7:09:30 AM ErrorsCleared Noted.

No Archived Event Logs