BSC - Big Sheep Creek ISA at km 6

Status:   Active - Non-Operational
Site Type: Instream Remote Detection System  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 10/28/2010 12:00 AM

In-stream detection system consisting of a tandem array located in Big Sheep Creek. The array (BSC) located at river km 6 (N 45.50649, W -116.85067) consists of two arrays , deployed serially 10 m apart, of two 20 ft Biomark flat panel antennas each. BSC is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Nez Perce Tribe and Quantitative Consultants, Inc. and was installed for continuous monitoring on October 20, 2010. The array includes ISEMP standard site monitoring equipment including air and water temperature probes, and a water pressure transducer to monitor stream level. Electrical power is provided by a thermal electric generator and remote communication provided by a satellite modem.

Current Operations

Last File Loaded: BSC-2021-298-P-00B.xml
Date Last File Loaded: 10/25/2021 9:20 AM
Date Last File Opened: 10/25/2021 3:58 AM
Date Last File Closed: 10/25/2021 7:58 AM
Last Observation Tag: 3DD.0077DAE48B
Last Observation Date: 10/1/2021 2:07 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Kyle Meier
kyle.meier@merck.com
208-275-0011

Data Steward:

Brett Turley
brett.turley@merck.com
208-841-2562

Location

Coordinates: 45.506482, -116.850735  |  River Km: 522.308.032.006

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2021
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/10/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 11/28/2018 12:00 AM Start and end dates based on first/last timer tag detections.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 1/1/2011 12:00 AM 1/1/2012 12:00 AM The site operated sporadically March 9-31; see event log for details. Two shed PIT tags were caught in the housings of antennas 1 and 3 from January 21-August 11 and from April 30-August 11, respectively.
2010 10/28/2010 12:00 AM 1/1/2011 12:00 AM First year of operation.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/1/2010
End Date:  ----

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
7/28/2020 10:31:00 AM SiteDown BSC array thermoelectric generator (TEG) stopped functioning on July 28, 2020 due to a leaking hose. The hose was replaced and the site became fully functional again on July 30, 2020.
6/16/2020 8:20:00 AM General Satellite SIM Card swapped, site visit. General clean up and maintenance performed. Brush and trees removed from antenna area.
9/7/2019 4:57:00 PM General BSC Thermo-electric generator (TEG) flame was put out due to a severe thunderstorm on 9/7/19 thus stopping data collection. The TEG was re-started on 9/23/19. BSC has run continuously without disruption through 10/09/19.
11/8/2018 7:16:00 AM General Big Sheep Creek (BSC) had Campbell Scientific data logger replaced with a new data logger designed by Biomark on November 8, 2018. A new HughesNet satellite modem/antenna was also installed. BSC site air temperature probe was changed out for a compatible model. BSC is operating continuously without disruption through November 26, 2018.
11/2/2018 7:16:00 AM General Big Sheep Creek (BSC) optical isolator between MUX and datalogger was found unplugged on 11/8/18. DRS and TAGS table was not recorded to the datalogger between 11/2/18 and 11/8/18. A BSC MUX buffer download showed no new PIT detections during this time.
5/25/2018 7:42:00 AM SiteDown Big Sheep Creek Array (BSC) Thermo electric generator flame was extinguished by thunderstorms at approximately 8:00 PM Friday May 25. BSC TEG was restarted and normal operations resumed on May 28 8:00 AM.
5/22/2018 8:27:00 AM SiteUp A severe rainstorm extinguished the thermo electric generator (TEG) flame at approximately 9:00 PM on May 22, 2018. The TEG as restarted on May 23. Normal operations resumed at 11:15 AM, May 23, 2018.
9/28/2017 1:56:00 PM General Big Sheep Creek (BSC) array antenna A2 was replaced with a 20 ft. PVC antenna manufactured by Westfork due to low current most likely caused by a water leak inside the original Biomark stout antenna. BSC is running continuously without disruption through 10-09-2017.
6/12/2017 12:51:00 PM SiteUp Big Sheep Creek Array (BSC) experienced heavy rainfall that extinguished the thermo-electric generator (TEG) flame turning the site off approximately 5:30 PM on 6/9/17. The TEG was restarted and normal operations resumed on 6/12/17 at 11:00 AM.
5/5/2017 7:46:00 AM General The optical isolator between the MUX and data logger was replaced at Big Sheep Creek array (BSC) on May 5, 2017. BSC has run continuously without disruption through 5/10/17.
11/22/2016 2:00:34 PM General Big Sheep Creek array is operating continuously without disruption through 11/22/2016.
8/28/2014 10:44:00 AM SiteUp Big Sheep Creek (BSC) is  functioning again and is operational through 9/23/14.
8/22/2014 10:44:00 AM SiteDown Big Sheep Creek (BSC) site went down on 8/22/14 17:30 due to a major rain event that caused the thermo electric generator to malfunction.