Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

CCA - Lower Charley Creek ISA

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Snake River Salmon Recovery Board
General Operational Period: Year Round
Start Date: 8/7/2009 12:00 AM

From August 2009 to April 2010, site consisted of a single antenna powered by a FS2001-ISO. In August 2010, a second antenna powered by a second cheeseblock was installed. The data collected from August 2009 - August 2011 was originally reported as Passive Recaptures. In August 2011, the site was upgraded to use a FS2001M and it was officially registered as an interrogation site in PTAGIS. In September 2017, a third antenna was added to the site. In December 2017, the original passive recapture records were removed and the detection records from that time period were submitted as interrogation data. Site was destroyed by wildfire July 2021, but was reinstalled in December 2021 with a Biomark IS1001 Master Controller and three antennas.

Current Operations

Last File Loaded: CCA-2022-147-P-001.xml
Date Last File Loaded: 6/15/2022 3:41 PM
Date Last File Opened: 5/27/2022 10:42 AM
Date Last File Closed: 6/15/2022 8:25 AM
Last Observation Tag: 384.1B79696FC8
Last Observation Date: 6/15/2022 8:24 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Ethan Crawford
Ethan.Crawford@dfw.wa.gov
509-751-0823

Data Steward:

Steve Bennett
bennett.ecological@gmail.com
435-757-5668

Location

Coordinates: 46.288458, -117.282497  |  River Km: 522.234.022.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2022
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on file created and closed dates.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 1/13/2011 12:00 AM 1/1/2012 12:00 AM Data from most of this year of operations originally submitted as Passive Recapture events. Those events were removed in 2017 and resubmitted as interrogation records.
2010 1/1/2010 12:00 AM 12/20/2010 12:00 AM Data from this year of operations originally submitted as Passive Recapture events. Those events were removed in 2017 and resubmitted as interrogation records.
2009 8/7/2009 12:00 AM 1/1/2010 12:00 AM Data from this year of operations originally submitted as Passive Recapture events. Those events were removed in 2017 and resubmitted as interrogation records.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  12/20/2021
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
5/14/2022 9:00:00 AM GMC

Site visit for general maintenance check and to download internal buffer memory on 5/14/2022.  Antenna 1 was disconnected from its node upon arrival at the site and appears to have been disconnected by debris and high flows at approximately 6 am on the morning of 5/8/2022.  Antenna 1 was reconnected to its node and tuned.  Site operating normally once again.

12/20/2021 12:00:00 PM SiteUp

All new/replacement components for the CCA site have been installed and the site is back up and operating normally.  All of the previous components at the site were lost to the Dry Gulch fire in early July of 2021.  The site is configured as it was previously with three 6' antennas and the new job box located where the old one was.  The transceiver has been upgraded from a Destron MUX style set up (previously) to a Biomark MTS with IS1001 ACN's/readers.  All ACN's were tuned prior to leaving site.

12/2/2021 12:00:00 PM General

Power has been restored to the site after subterranean powerline that runs between the charger/converter box and the job box has been replaced.  The powerline was damaged during the Dry Gulch fire in early July.  The site will remain down until the remaining replacement components for site are acquired and installed.

7/7/2021 4:00:00 PM SiteDown

Site down due to damage sustained from the Dry Gulch fire.  Site likely went down sometime during the afternoon of July 7.  All site components sustained heavy fire damage and will need to be replaced to make site operable again.  Any data recorded on the MUX internal buffer memory between June 15, 2021 and the point at which the site burned on July 7 has been lost.  The site will be down until further notice.