Interrogation Site Metadata
MCL - Lower Mission Creek Instream
Status: Active - Operations UnspecifiedGeneral Operational Period: Year Round
Start Date: 10/4/2011 4:53 PM
This site is a permanent instream PIT tag detection system located at rkm 0.7 on Mission Creek (Wenatchee River Basin), near Cashmere, WA. The site consists of three rows of antennas (5 total antennas), installed in flat plate configuration. Each row of antenna spans the wetted width of the channel during base flows. The antennas were built and installed by WDFW. The site is connected to grid power to charge the battery bank powering the transceiver.
Current Operations
Last File Loaded: | MCL-2023-148-P-006.json |
Date Last File Loaded: | 5/29/2023 3:40 AM |
Date Last File Opened: | 5/28/2023 9:43 PM |
Date Last File Closed: | 5/29/2023 12:43 AM |
Last Observation Tag: | 3DD.003DA28DC2 |
Last Observation Date: | 5/25/2023 12:04 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2023 | |||
2022 | 1/1/2022 12:00 AM | 5/5/2022 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | |
2013 | 1/1/2013 12:00 AM | 1/1/2014 12:00 AM | No reported interruptions in operations. |
2012 | 1/1/2012 12:00 AM | 1/1/2013 12:00 AM | |
2011 | 10/4/2011 4:53 PM | 1/1/2012 12:00 AM | First year of operations. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
UPSTREAM ARRAY | B0 | B1 |
MIDDLE ARRAY | B0 | B2 |
MIDDLE ARRAY | B0 | B3 |
DOWNSTREAM ARRAY | B0 | B4 |
DOWNSTREAM ARRAY | B0 | B5 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
7/14/2022 2:36:00 PM | General |
Antenna 1 broke on 5-4-22. |
10/28/2021 12:00:00 AM | General |
Antenna 3 was plugged back in it was unplugged on10/24/21. |
6/22/2020 9:51:00 AM | General | Site was experiencing extreme noise from 6-16-20 to 6-22-20. Array was not detecting tags during this period. Noise was troubleshot and fixed on 6-22-20. |
7/6/2017 1:00:00 PM | General | At interrogation site MCL on 7/6/2017 at approximately 1:00 PM, temperature probe was reinstalled. |
12/31/2015 3:20:00 PM | General | Site operated without interruption in 2015. |
12/31/2014 3:20:00 PM | General | Site operated without interruption in 2014. |
12/31/2013 8:00:00 AM | General | MCL operated without interruption in 2013 |