Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

BTC - Big Timber Creek

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Idaho Dept. of Fish and Game
General Operational Period:
Start Date: 2/25/2010 9:50 AM
End Date: 10/15/2013 11:30 AM

This is an instream interrogation system consisting of two 10-foot pass-by antennas arrayed in tandem at km 1.3 on Big Timber Creek. Site was decommissioned October 2013. New site with code BTL was installed 1km downstream and replaces this site.

Contacts

Data Steward:

Brett Turley
brett.turley@merck.com
208-841-2562

Location

Coordinates: 44.688110, -113.370410  |  River Km: 522.303.416.089.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2013 1/1/2013 12:00 AM 10/15/2013 11:30 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 1/1/2011 12:00 AM 1/1/2012 12:00 AM
2010 2/25/2010 9:50 AM 1/1/2011 12:00 AM First year of operation.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/20/2010
End Date:  10/15/2013

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
10/15/2013 1:00:00 PM General BTC PIT array site upstream of HWY 28 was shutdown and removed. New BTC array site was relocated downstream closer to mouth. However, new BTC array site is still in test stage as of 12/31/13. No new data is being uploaded to PTAGIS yet.
5/8/2013 1:00:00 PM General There were communication issues, the modem was hard reset onsite and new firmware was uploaded. Also, the CR1000 locked up and system was reset.

Archived Event Logs