Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

Search by typing either a site name, site code, organization, or site type.

IR1 - Lower Imnaha River ISA @ km 7

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 12/3/2010 12:00 AM

In-stream detection system consisting of a single array located in the lower Imnaha River. The array (IR1) located at river km 7 (N 45.761162, W -116.750658) consists of four 20 foot Biomark flat panel antennas that span the entire river at base flow. IR1 is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Nez Perce Tribe and Quantitative Consultants, Inc. and was installed for continuous monitoring on December 3, 2010. The array includes ISEMP standard site monitoring equipment including: air and water temperature probes, and a water pressure transducer to monitor stream level. Electrical power is provided by a solar/propane hybrid thermal electric generator and remote communication provided by a satellite modem.

Current Operations

Last File Loaded: IR1-2021-295-P-00E.xml
Date Last File Loaded: 10/22/2021 9:32 PM
Date Last File Opened: 10/22/2021 3:27 PM
Date Last File Closed: 10/22/2021 7:27 PM
Last Observation Tag: 3DD.007791841F
Last Observation Date: 10/22/2021 6:00 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Kyle Meier
kyle.meier@merck.com
208-275-0011

Data Steward:

Brett Turley
brett.turley@merck.com
208-841-2562

Location

Coordinates: 45.761052, -116.750231  |  River Km: 522.308.007

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2021
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 1/1/2011 12:00 AM 1/1/2012 12:00 AM High noise levels from January 11 - March 10.
2010 12/3/2010 12:00 AM 1/1/2011 12:00 AM First year of operation.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  12/1/2010
End Date:  ----

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
6/17/2020 8:20:00 AM General Satellite SIM Card swapped, site visit. General clean up and maintenance performed. Brush and trees removed from antenna area.
10/9/2019 4:57:30 PM General IR1 is operating continuously without disruption through October 9, 2019.
11/13/2018 7:16:00 AM General Imnaha River 1 (IR1) had Campbell Scientific data logger replaced with a new data logger designed by Biomark on November 13, 2018. A new HughesNet satellite modem/antenna was also installed. IR1 site air temperature probe was changed out for a compatible model. IR1 is operating continuously without disruption through November 26, 2018.
9/26/2018 7:10:00 AM General Imnaha River 1 (IR1) antenna B2 began losing current in late August 2018 and was replaced with a 20 ft. Biomark HDPE antenna on September 26, 2018. IR1 is operating continuously without disruption through 10/21/18.
8/16/2018 2:27:00 PM General Imnaha River 1 (IR1) antenna B3 lost substantial current on June 26, 2018. Antenna B3 was replaced with a 20 ft. PVC antenna on 8/16/18. IR1 has run continuously without disruption through 8/17/18.
2/1/2018 9:45:00 AM General Imnaha River 1 (IR1) array had all 6 deep cell Solar batteries replaced on 2/1/18.. IR1 is functioning continuously without disruption through 2/7/18.
8/31/2017 8:43:00 AM General Imnaha River 1 (IR1) antenna B2 was repaired by plugging the antenna cable back in and securing the cable with zip ties. Pressure transducer and additional antenna cables were secured under antennas. IR1 is running continuously without disruption through 9/5/17.
5/4/2017 7:46:00 AM General The optical isolator between the MUX and data logger was replaced at Imnaha River 1 array (IR1) on May 4, 2017. IR1 has run continuously without disruption through 5/10/17.
12/19/2016 2:24:03 PM General Imnaha River 1 (IR1) has operated continuously without disruption through 12/19/16
9/23/2014 10:44:00 AM General Imnaha 1 (IR1) is functioning and operational without disruption through 9/23/14.

Archived Event Logs