Interrogation Site Metadata

IR1 - Lower Imnaha River ISA @ km 7

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 12/3/2010 12:00 AM

In-stream detection system consisting of a single array located in the lower Imnaha River. The array (IR1) located at river km 7 (N 45.761162, W -116.750658) consists of four 20 foot Biomark flat panel antennas that span the entire river at base flow. IR1 is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Nez Perce Tribe and Quantitative Consultants, Inc. and was installed for continuous monitoring on December 3, 2010. The array includes ISEMP standard site monitoring equipment including: air and water temperature probes, and a water pressure transducer to monitor stream level. Electrical power is provided by a solar/propane hybrid thermal electric generator and remote communication provided by a satellite modem.

Current Operations

Last File Loaded: IR1-2024-109-P-003.json
Date Last File Loaded: 4/18/2024 5:20 PM
Date Last File Opened: 4/18/2024 12:45 PM
Date Last File Closed: 4/18/2024 3:49 PM
Last Observation Tag: 3DD.003E2CE0D6
Last Observation Date: 4/18/2024 1:25 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Cameron Albee
camerona@nezperce.org
541-432-2503

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 45.761052, -116.750231  |  River Km: 522.308.007

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 1/1/2011 12:00 AM 1/1/2012 12:00 AM High noise levels from January 11 - March 10.
2010 12/3/2010 12:00 AM 1/1/2011 12:00 AM First year of operation.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  12/1/2010
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
11/3/2023 12:00:00 AM General

IR1 is operating continuously without disruption through November 3, 2023.

10/18/2022 1:00:00 PM General

Antenna B1 was replaced with a new Biomark 20 ft. PVC antenna.  B1 started losing current May 29, 2022 but was still operational at 1.15 A and continued detecting PIT tags and virtual test tags at less than optimal performance.  IR1 is operating continuously without disruption through October 20, 2022.

9/21/2022 12:00:00 PM SiteUp

Site electronics enclosure was re-installed September 21, 2022 as the the threat of fire at IR1 subsided.  IR1 is operating continuously without disruption again.

9/10/2022 12:00:00 AM SiteDown

Site electronics enclosure was removed due to threat of burning up from the Double Creek Fire.  Site is down indefinitely.

5/29/2022 12:00:00 AM SiteUp

Antenna B1 lost 2A of current on May 29, 2022.  B1 likely has a reduced read range affecting IR1 detection probability. 

11/2/2021 12:00:00 AM General

IR1 is operating continuously without disruption through November 2, 2021.

6/17/2020 8:20:00 AM General Satellite SIM Card swapped, site visit. General clean up and maintenance performed. Brush and trees removed from antenna area.
10/9/2019 4:57:30 PM General IR1 is operating continuously without disruption through October 9, 2019.
11/13/2018 7:16:00 AM General Imnaha River 1 (IR1) had Campbell Scientific data logger replaced with a new data logger designed by Biomark on November 13, 2018. A new HughesNet satellite modem/antenna was also installed. IR1 site air temperature probe was changed out for a compatible model. IR1 is operating continuously without disruption through November 26, 2018.
9/26/2018 7:10:00 AM General Imnaha River 1 (IR1) antenna B2 began losing current in late August 2018 and was replaced with a 20 ft. Biomark HDPE antenna on September 26, 2018. IR1 is operating continuously without disruption through 10/21/18.
8/16/2018 2:27:00 PM General Imnaha River 1 (IR1) antenna B3 lost substantial current on June 26, 2018. Antenna B3 was replaced with a 20 ft. PVC antenna on 8/16/18. IR1 has run continuously without disruption through 8/17/18.
2/1/2018 9:45:00 AM General Imnaha River 1 (IR1) array had all 6 deep cell Solar batteries replaced on 2/1/18.. IR1 is functioning continuously without disruption through 2/7/18.
8/31/2017 8:43:00 AM General Imnaha River 1 (IR1) antenna B2 was repaired by plugging the antenna cable back in and securing the cable with zip ties. Pressure transducer and additional antenna cables were secured under antennas. IR1 is running continuously without disruption through 9/5/17.
5/4/2017 7:46:00 AM General The optical isolator between the MUX and data logger was replaced at Imnaha River 1 array (IR1) on May 4, 2017. IR1 has run continuously without disruption through 5/10/17.
12/19/2016 2:24:03 PM General Imnaha River 1 (IR1) has operated continuously without disruption through 12/19/16
9/23/2014 10:44:00 AM General Imnaha 1 (IR1) is functioning and operational without disruption through 9/23/14.

Archived Event Logs