Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

LWN - Little Wenatchee River

Status:   Active - Non-Operational
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Seasonally
Start Date: 6/23/2009 12:00 PM

This is a permanent instream PIT tag interrogation site at rkm 4 located at the old fish weir. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of 3 20-foot HDPE antennas, installed in flat-plate configuration onto the old weir decking. The original FS1001M transceiver was replaced with an IS1001MC in October 2023. It is powered by a solar array and an Outback charge controller. The antennas were built and installed by WDFW. A cellular modem is installed on site to provide remote communication and allow for automated data collection. A submersible pressure transducer and temperature probes are installed on site to monitor environmental conditions. Site has a usual operation window of March to early/mid November depending on solar conditions.

Current Operations

Last File Loaded: LWN-2024-107-P-001.json
Date Last File Loaded: 4/16/2024 7:31 AM
Date Last File Opened: 4/16/2024 2:30 AM
Date Last File Closed: 4/16/2024 5:30 AM
Last Observation Tag: 3DD.003D99EAD3
Last Observation Date: 4/15/2024 10:49 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
509-664-3148

Location

Coordinates: 47.833504, -120.833729  |  River Km: 754.090.008.004

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 3/13/2023 12:00 AM 11/4/2023 12:00 AM Start and end dates based on timer tags.
2022 3/15/2022 12:00 AM 11/2/2022 12:00 AM Start and end dates based on timer tags.
2021 3/11/2021 12:00 AM 11/18/2021 12:00 AM Start and end dates based on timer tags.
2020 3/16/2020 12:00 AM 11/19/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 3/26/2019 12:00 AM 11/14/2019 12:00 AM Start and end dates based on timer tags.
2018 3/15/2018 12:00 AM 11/20/2018 12:00 AM Start and end dates based on timer tags.
2017 3/16/2017 12:00 AM 12/1/2017 12:00 AM Start and end dates based on timer tags.
2016 3/17/2016 12:00 AM 11/14/2016 12:40 PM Antennas 3 and 6 were non-functional until June 27.
2015 3/26/2015 12:00 AM 1/1/2016 12:00 AM
2014 3/20/2014 12:00 AM 12/12/2014 12:00 AM Antenna 6 down March 20-July 21. Antenna 5 down June 7-July 21. Antenna 2 down March 28-July 22.
2013 3/28/2013 12:00 AM 12/4/2013 12:00 AM Batteries replaced and site turned back on March 28. Antenna 6 washed away May 8. Site shut down for winter on December 4.
2012 1/3/2012 3:08 PM 11/28/2012 8:30 PM Site down several times during early January due to solar power issue. Site down January 16-March 20 due to solar power issues. Site shut down in late November due to soalar power issues.
2011 1/1/2011 12:00 AM 12/31/2011 3:43 PM The Little Wenatchee array ran out of power on 1-22-11 at 10:09:38 due to poor solar conditions. A generator was brought in and left running to recharge batteries at the site. The site began recording on March 11th, 2011 at 19:42 but quickly ran out of power. The site ran and recorded tags between 3-14-11 at 13:43:07 to 3-20-11 at 16:43:57. The site was turned back on 4-7-11 at 08:17:00. Site down from December 24-29 and from December 31 - January 3, 2012 due to power loss.
2010 3/15/2010 12:00 AM 1/1/2011 12:00 AM No power was available to the site between Nov. 30 and Dec. 23.
2009 6/23/2009 12:00 PM 10/26/2009 11:03 AM First year of operation for Little Wenatchee River site. Todd Miller (509.664.3148.x24, Todd.Miller@dfw.wa.gov) is the Data Steward and primary Point-of-Contact. The array was shut down at 11:03 on October 26, 2009 until further notice.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/11/2023
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
11/3/2023 12:00:00 PM SiteDown

Turned site off for the season at approximately 12:00 PM

10/11/2023 12:00:00 PM SiteUp

Site was down from approximately 10:00 AM on 10/09/2023 to 12:00 PM on 10/11/2023.  Site upgraded to IS1001 MC, antennas replaced with HDPE configuration 6 - 20' 1-6.

7/29/2023 8:43:00 AM General

Antenna 6 lost current on 29 July. Antenna 4 has high noise.

3/13/2023 1:00:00 PM SiteUp

Site was restarted at approximately 13:00, all antennas working.

11/1/2022 12:00:00 PM SiteDown

Site was turned off for winter due to deteriorating solar conditions.

8/4/2022 12:00:00 AM General

On 06/10/2022,  Antenna #2 and antenna #3 went offline. On 08/04/2022 Antenna #2 and Antenna #3 were brought back online.

7/14/2022 2:53:00 PM General

Antennas 1, 4 are reporting 0 amps as of 6-10-22

3/15/2022 12:00:00 PM SiteUp

Site was turned on after being off for winter. Antennas were connected and working. 

12/1/2021 12:00:00 AM SiteDown

Interrogation site LWN was shut down.  LWN power operates on Solar power and the site does not receive enough sunlight to stay operational. Solar charger was left on to maintain battery levels. HOBO temperature logger was deployed at same time.

3/11/2021 12:00:00 PM SiteUp Site was turned on for the season all antennas working. Modem did not connect right away.
11/18/2020 8:53:00 AM SiteDown On 11/18/20 the site was turned off for winter due to a lack of available solar power.
3/16/2020 2:58:23 PM SiteUp Site was turned back on at 12:30 pm on 3/16/20. All antennas working.
11/14/2019 12:00:00 PM SiteDown FS-1001M was turned off for the winter due to lack of solar energy. Modem and peripheral data was left on.
3/26/2019 8:44:00 AM SiteUp Site was turned on after the winter hibernation all antennas were working.
11/19/2018 8:56:00 AM SiteDown The Mux was turned off for winter to save power on 11/19/18 at approximately 15:00. Peripheral data collection instruments and modem were left on to collect environmental data.
8/8/2018 12:00:00 PM General At interrogation site LWN on 8/8/2018 at approximately 12:00 PM, Antenna #2 was brought back online. Cable was replaced. All antennas at this site are functioning. Site is fully operational.
8/8/2018 12:00:00 PM General At interrogation site LWN on 8/8/2018 at approximately 12:00 PM, Antenna #2 was brought back online. Cable was replaced. All antennas at this site are functioning. Site is fully operational.
3/15/2018 2:33:29 PM SiteUp The interrogation site LWN was restarted today 3/15/18 at approximately 11am. The site had been winterized due to lack of sufficient sunlight to power array.
11/30/2017 3:33:00 PM SiteDown The LWN interrogation site was put into standby mode on 11/30/17 at approximately 15:30 and will be shut down for the rest of winter due to lack of sunlight to power site.
11/8/2017 9:27:28 AM General Mux clock was reset to the correct time.
7/28/2017 12:00:00 PM General At interrogation site LWN on 7/28/2017 at approximately 12:00 PM, Antennas #2 and #3 were brought back online. Antennas #2 and #3 were broken, they were replaced with HDPE antennas. All antennas at this site are functioning, site is fully operational.
5/28/2017 3:00:00 AM General At interrogation site LWN on 5/28/2017 at approximately 3:00 AM, Antenna #3 lost power.
3/16/2017 11:00:00 AM General At interrogation site LWN Antenna #2 has not operated since site was brought back online on 3/16/2017 at approximately 11:00 AM. Antenna #3 is not operational. All other antennas are fully operational.
3/16/2017 11:00:00 AM SiteUp At interrogation site LWN on 3/16/2017 at approximately 11:00 AM, Array was powered back up. All antennas are working, and site is fully operational.
11/14/2016 8:32:00 AM SiteDown The interrogation site LWN was shut down for the winter months due to lack of solar power on 11-14-16 at 12:40.

Archived Event Logs