Interrogation Site Metadata
UWE - Upper Wenatchee River
Status: Active - Non-OperationalGeneral Operational Period: Year Round
Start Date: 10/12/2012 12:00 AM
This site is a permanent instream PIT tag detection system located at rkm 81.2 on the Wenatchee River, near Plain, WA. The site consists of 6 20-foot antennas in a single row, installed in flat-plate configuration. The row of antennas spans the wetted width of the channel during base flows. The antennas were built and installed by WDFW. The site is powered by a thermoelectric generator. A Campbell Scientific CR-1000 data logger and cellular modem are installed on site to automate data collection and provide remote communication. A water temperature and pressure probe, and an air temperature probe are also installed on site to monitor environmental conditions.
Current Operations
Last File Loaded: | UWE-2023-148-P-004.json |
Date Last File Loaded: | 5/29/2023 2:08 AM |
Date Last File Opened: | 5/28/2023 9:17 PM |
Date Last File Closed: | 5/28/2023 9:17 PM |
Last Observation Tag: | 3DD.003DE887AB |
Last Observation Date: | 5/28/2023 9:17 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2023 | |||
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 12/31/2017 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | |
2013 | 1/1/2013 12:00 AM | 1/1/2014 12:00 AM | Site down from September 5 - October 14 due to generator failure. |
2012 | 10/12/2012 12:00 AM | 1/1/2013 12:00 AM | Reinstalled site in a different location and with different configuration in October 2012. |
2011 | UWE was not installed and did not collect any data in 2011. | ||
2010 | UWE did not report any data to PTAGIS in 2010. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
IN-STREAM ARRAY | B0 | B1 |
IN-STREAM ARRAY | B0 | B2 |
IN-STREAM ARRAY | B0 | B3 |
IN-STREAM ARRAY | B0 | B4 |
IN-STREAM ARRAY | B0 | B5 |
IN-STREAM ARRAY | B0 | B6 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
4/7/2020 3:35:52 PM | SiteDown | Array briefly lost power from 3/16/20 at 15:00 to 3/17/20 at 12:00. |
11/19/2018 8:56:00 AM | General | Cell phone signal booster was added to the site on 11/19/18 in attempt to re establish remote comms |
9/18/2018 3:46:00 PM | General | New 4G modem installed and new Biomark data logger probe board added. |
3/16/2018 2:00:00 PM | General | At interrogation site UWE on 3/16/2018 at approximately 2:00 PM, two dropped PIT tags were removed from antenna #4. Tags were creating noise and causing antenna to not function properly. All antennas are now functioning and site is fully operational. |
5/5/2017 9:00:00 AM | General | At interrogation site UWE on 5/5/2017 at approximately 9:00 AM, Mux lost communication with modem. Communication was down from 5/5/2017 to approximately 5/10/2017. |
8/12/2016 12:00:00 PM | General | At interrogation site UWE, on 8/12/2016 at approximately 12:00pm, antenna #2 was replaced. All antennas are functioning properly. Site is fully operational. |
11/19/2015 3:35:00 PM | General | At interrogation site UWE, Antenna #2 lost current on 11/19/2015 and is no longer operational. |
7/6/2015 8:44:00 AM | General | On 7-6-15 a dropped tag was found and removed from antenna B1. |
12/31/2014 10:05:00 AM | General | Site ran without interruption in 2014. |
9/5/2013 4:30:00 PM | General | UWE site lost power and was down from 9/5/13 at 04:30 until 10/14/13 at 10:45. The thermoelectric generator failed, resulting in a loss of power to the site until a replacement TEG could be installed. A replacement TEG was installed on 10/14/13. Data from 10/14 through 10/22 was uploaded manually, as the power failure also caused the battery supply for the CR1000 to fail. A replacement battery for the CR1000 was installed on 10/22, and data is being automatically uploaded daily. |