Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

PD7 - Columbia River Estuary rkm 70

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: NOAA Fisheries
General Operational Period: Seasonally
Start Date: 8/8/2011 12:00 AM

In-river detection system consisting of four 8ft x 20ft antennas in the Columbia River Estuary. The array (PD7) is located at river km 70 (46.14661N, -123.379867W), is operated by NOAA Fisheries, and was installed for testing on 8 August, 2011 and later modified for continuous monitoring on 11 August, 2011. The array includes an IS1001 transceiver (firmware v1.7.1) and individual IS1001 readers. Electrical power is provided by a solar panel array with backup battery power, and remote communication is provided by a cellular modem. Antenna groups are named based on their orientation relative to the pile dike starting with Configuration Sequence 180. Prior configurations were named based on orientation relative to flow.

Current Operations

Last File Loaded: PD7-2024-108-P-001.json
Date Last File Loaded: 4/17/2024 11:50 AM
Date Last File Opened: 4/10/2024 10:00 AM
Date Last File Closed: 4/17/2024 10:00 AM
Last Observation Tag: 3DD.003D8D4212
Last Observation Date: 4/17/2024 8:44 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Paul Bentley
Paul.Bentley@noaa.gov
503-861-1818

Data Steward:

Kara Jaenecke
kara.jaenecke@noaa.gov
585-406-6278

Location

Coordinates: 46.146610, -123.379867  |  River Km: 070

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 4/24/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 3/30/2022 12:00 AM 5/31/2022 12:00 AM Start and end dates based on timer tags.
2021 Site did not operate in 2021 due to COVID-19 restrictions.
2020 1/2/2020 12:00 AM 9/29/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/22/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 2/26/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 3/11/2016 12:00 AM 10/19/2016 12:00 AM Start and end dates based on timer tags.
2015 3/3/2015 12:00 AM 10/20/2015 12:00 AM Start and end dates based on timer tags.
2014 3/4/2014 12:00 AM 11/4/2014 12:00 AM Antennas were installed at different times and in different configurations throughout the year. See event log for details.
2013 3/5/2013 12:00 AM 10/28/2013 12:00 AM Site reinstalled March 5 with two large antennas replacing the six smaller antennas. These two antennas were replaced on April 25 by three new antennas. Two additional antennas were installed August 23.
2012 3/21/2012 12:00 AM 10/24/2012 6:30 AM
2011 8/8/2011 12:00 AM 10/25/2011 12:00 AM First year of operations for this prototype interrogation site. It was initially deployed with four antennas. Two antennas were added to the configuration from September 14-28. The site was removed on October 25.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  6/15/2023
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
11/15/2023 12:30:00 PM SiteUp

Site back up after resolving power issues. 

11/6/2023 4:30:00 PM SiteDown

Site down due to power issues. 

10/2/2023 1:00:00 PM General

Removed antenna 02, start of season shutdown. 

6/21/2023 2:30:00 PM General

Antenna 06 (top of stacked adult antenna, furthest inshore) replaced and connected. 

6/15/2023 11:00:00 AM General

Stacked adult downstream antenna added furthest inshore. Top antenna (06) unable to connect due to electrical issues. Bottom antenna (07) connected. 

6/14/2023 10:45:00 AM General

Added antenna 05 (downstream adult, same position on dike rotated 180 degrees).

6/1/2023 9:30:00 AM General

Antenna 06 (upstream juvenile, furthest inshore) removed.

5/16/2023 12:30:00 PM SiteUp

Site back online. Antennas 01,02,03,04, and 06 ON.

5/9/2023 1:00:00 PM SiteDown

Site offline due to electrical issues.

5/2/2023 10:45:00 AM General

Added antenna 02 (transverse) on spar extending into channel from king pile at 1045. Antenna 05 offline due to electrical damage at 1700. 

4/26/2023 1:10:00 PM General

Added antenna 03 (first upstream juvenile antenna, closest to king pile). 

4/20/2023 12:30:00 PM General

Added antennas 01 (downstream adult antenna on king pile) and 06 (upstream juvenile antenna, furthest towards shore). 

4/18/2023 10:45:00 AM SiteUp

Site back up after resolving electrical issues. Antenna 04 and 05 (previously 02 and 04) reconnected. 

4/6/2023 11:30:00 AM SiteDown

Site down due to electrical issues.

3/7/2023 10:58:00 AM SiteUp Site reinstalled 3/7/23 with antennas 02&04
11/8/2022 9:44:00 AM General

In 2022, PD7 operated from 30 March through 4 October 2022.  In total, PD7 detected 491 tagged fish including 184 spring/summer Chinook salmon, 112 fall Chinook salmon, 83 steelhead, 44 coho salmon, 9 sockeye salmon, 43 white sturgeon, and 16 fish with no species information in PTAGIS.  We plan to reinstall PD7 in Spring 2023.

10/4/2022 8:33:00 AM SiteDown Site taken down for seasonal maintenance. Will resume operation in Spring 2023.
3/30/2022 3:00:00 PM SiteUp

We resumed power to PD7 on 3/30/2022 and are currently operating antennas 01, 02, and 04. In February 2022, we had removed the electronics box and all remaining antennas at PD7 for repair or replacement.  We reinstalled the electronics box and antennas 01, 02, and 04 throughout March 2022, and plan to add an additional 2-3 antennas throughout April.  

11/1/2021 8:55:00 AM SiteDown

We were unable to operate PD7 in 2021 due to continued COVID-19 restrictions, and it has remained shutdown since September 2020. We have plans to re-install PD7 next year and hope to resume PIT interrogation at this site by spring of 2022.

9/29/2020 6:18:55 AM General PD7 was shutdown for winter maintenance. We will potentially reinstate system functionality in the spring of 2021.
3/12/2020 12:03:00 PM General Power to the site was restored. Antennas 01, 04, 06, and 0A are installed and functioning.
2/16/2020 12:00:00 PM General From 2/16/20-3/11/20 PD7 was undergoing maintenance. No data was recorded during this period.
12/27/2019 12:00:00 AM General Antennas at nodes 08 and 09 were removed from the system to conserve power.
11/18/2019 12:00:00 AM General The antenna at node 2 failed due to water damage and was removed from the system. It will be repaired and replaced at a later date.
10/28/2019 10:55:00 AM SiteDown The site was down due to power failure between 9/25/19 at 1413 and 10/9/19 at 1240, except for a few brief periods lasting less than a few hours at a time. The site also lost power between 10/12/19 at 2047 and 10/15/19 at 1431.

Archived Event Logs