Interrogation Site Metadata
BVJ - BONNEVILLE DAM DMS1 SUBSAMPLE
Status: DecommissionedGeneral Operational Period:
Start Date: 5/1/1992 8:26 AM
End Date: 10/29/1999 12:00 AM
Bonneville Dam PH1 Juvenile Bypass (DSM1) sub-sample
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
1999 | 3/20/1999 12:00 AM | 10/29/1999 12:00 AM | Subsampled during 8-hr period 1600-2400. |
1998 | 3/9/1998 7:00 AM | 10/31/1998 7:00 AM | Subsampled during 8-hr period 1600-2400. |
1997 | 4/5/1997 8:54 PM | 10/14/1997 8:52 PM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1996 | 4/23/1996 7:14 PM | 10/16/1996 6:37 PM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1995 | 4/12/1995 2:47 AM | 9/19/1995 9:04 PM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1994 | 4/27/1994 9:00 PM | 10/22/1994 9:22 AM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1993 | 3/31/1993 12:52 PM | 9/11/1993 7:31 AM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1992 | 5/1/1992 8:26 AM | 6/27/1992 4:55 PM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
SAMPLE ROOM | C0 | C0 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|