Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

PRO - Prosser Diversion Dam Combined

Status:   Active - Operational
Site Type: Combined Dam Location  |  Organization: Pacific States Marine Fisheries Commission
General Operational Period: Year Round
Start Date: 11/16/2004 11:00 AM

This site monitors the (three) fish ladders and juvenile sampling facility at Prosser Dam. Each ladder has two antennas installed at the counting window. The juvenile sampling facility has antennas installed downstream of the separator and at the exit from the sample room.

Current Operations

Last File Loaded: PRO-2024-116-P-004.json
Date Last File Loaded: 4/25/2024 5:04 AM
Date Last File Opened: 4/25/2024 3:00 AM
Date Last File Closed: 4/25/2024 4:00 AM
Last Observation Tag: 3DD.0077C77789
Last Observation Date: 4/25/2024 3:51 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Don Warf
dlwarf@psmfc.org
509-735-2773

Data Steward:

Nicole Tancreto
ntancreto@psmfc.org
503-595-3141

Location

Coordinates: 46.212539, -119.772663  |  River Km: 539.076

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM
2019 1/1/2019 12:00 AM 1/1/2020 12:00 AM Site operated year round, but unknown when JFF was in operation.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM The JFF was in operation from January 10-July 9.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM JMF was dewatered February 3-23.
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM The JMF watered up sometime during the week of December 26, 2011, and the facililty began operations on January 3. All three ladders were closed February 23-27 due to flooding. Left and middle ladders closed on April 25 due to high water and debris.
2011 1/1/2011 12:00 AM 1/1/2012 12:00 AM The Chandler Canal JMF watered up on Jan. 14. The JMF operated from Jan. 14-18, Jan. 21-24, and resumed operation on Jan. 27. All three ladder entrances were closed on Jan. 18; the right ladder reopened on Jan. 24, the middle ladder reopened on Jan. 26, and the left ladder returned to service the week of March 21. Due to adverse river conditions, the center and left bank ladder exit gates were closed from Apr. 1 to Apr. 6. The juvenile fish facility was dewatered from Apr. 1 to Apr. 5 for repairs. All three adult ladders were closed May 16-May 25. The JFF was shut down on July 30. Left ladder lost power for several hours on November 28.
2010 1/1/2010 12:00 AM 1/1/2011 12:00 AM The Chandler Canal JFF watered up at 8 AM on January 3. The JFF dewatered at 10 PM on July 17.
2009 1/1/2009 12:00 AM 1/1/2010 12:00 AM The detection equipment was removed from the left and center ladders on January 7 due to the threat of flooding, and re-installed on January 14. The juvenile fish sampling facility (JFSF) watered up for the season on Jan. 23. The JSFS was dewatered from May 31 until June 5 due to a broken hinge pin on the track rack cleaners for the channel. The JSFS was dewatered for the season on July 25.
2008 1/1/2008 12:00 AM 1/1/2009 12:00 AM The Prosser juvenile fish sampling facility (JFF) watered-up on Jan. 6 and sampling operations began on Jan. 7. The canal (and JFF) was dewatered from Jan. 23 until Feb. 3 due to cold weather. The transceivers in the left and center adult fish ladders were removed between May 16 and May 22 due to high river flows and possible flooding of the equipment rooms. Sampling operations for the 2008 outmigration concluded on July 19, and the JFF was dewatered. The right bank ladder denil was in operation continuously from September 2 until December 11, during which time 76 PIT-tagged fish were detected in that ladder.
2007 1/1/2007 12:00 AM 1/1/2008 12:00 AM The JFF was watered up on Jan. 9, 2007. Chandler Canal and the JFF were dewatered between Jan. 30 and March 22. The PIT tag detection equipment was pulled from the center and left ladders on March 13 due to high water and the potential for flooding. The equipment was re-installed on March 21, at which time we observed that all three ladders were dewatered. The three ladders watered up between March 22-30. The left ladder was dewatered on April 16 or 17, and was returned to operation sometime before April 26. The right ladder was dewatered between July 5-17. The JFF was dewatered on July 10.
2006 1/1/2006 12:00 AM 1/1/2007 12:00 AM The juvenile fish lab watered-up at 9:00 AM on January 8, 2006. The juvenile lab flooded on April 30 and was out of service until 9 AM on May 31. The Left Bank and Middle ladder detectors were taken out of service on May 19 due to high river flows, with leaks or the threat of flooding in the PIT tag equipment vaults. The Center Ladder detectors were returned to service at ~14:30(PST) on May 23. The Left Bank Ladder returned to service at ~8AM on May 25. The juvenile fish lab was dewatered on July 8 for the rest of the migration year. The Middle Ladder was dewatered on July 6, and rewatered between Nov. 6 - 13 in response to a flood event. The denil sampler in the Right Bank Ladder at Prosser was in operation from Sept. 25 - Nov. 8, Nov. 13 - Nov. 21, and Nov. 27 - Dec. 5, 2006. The denil bypasses the counting window in the Right Bank Ladder. Therefore, fish were effectively diverted around the Right Bank Ladder PIT tag antennas (05 and 06) during these intervals.
2005 1/1/2005 12:00 AM 1/1/2006 12:00 AM The JFF started sampling fish at 9 AM on Jan. 23. The JFF was dewatered on July 6, and all fish were subsequently routed to the river via the Primary Bypass Flume. The right ladder was watered up on Aug. 19, 2005; the new PIT tag detectors in this ladder were first activated on Aug. 30. The new PIT tag detectors in the middle ladder were first activated on Oct. 26, 2005.
2004 11/16/2004 11:00 AM 1/1/2005 12:00 AM First year of operation. Supercedes original PRJ site, expanded to include the PIT tag antenna array at the Left Bank adult ladder counting window, which was brought on-line on Nov. 16, 2004.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  8/30/2005
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
4/2/2024 7:08:41 AM ErrorsCleared Short noise event.
3/24/2024 8:03:57 AM ErrorsCleared Noted.
3/22/2024 7:46:47 AM ErrorsCleared Short noise event.
3/20/2024 7:28:20 AM ErrorsCleared Short noise event.
3/12/2024 7:12:41 AM ErrorsCleared Short noise event.
3/6/2024 9:48:50 AM ErrorsCleared Noted.
2/23/2024 7:16:25 AM ErrorsCleared Short noise event.
2/15/2024 9:24:33 AM ErrorsCleared Short noise event.
2/6/2024 7:08:48 AM ErrorsCleared Short noise event.
2/5/2024 7:12:41 AM ErrorsCleared Short noise event.
1/25/2024 7:12:32 AM ErrorsCleared Noted.
1/16/2024 8:43:12 AM ErrorsCleared Noted.
1/15/2024 7:37:05 AM ErrorsCleared I was able to remote into the site and checked for invalid characters and did not see any. We will continue to monitor for these alarms.
1/14/2024 8:22:28 AM ErrorsCleared Noted.
12/29/2023 7:16:29 AM ErrorsCleared Short noise event.
12/26/2023 7:09:22 AM ErrorsCleared Short noise event.
12/23/2023 11:10:35 AM ErrorsCleared Short noise event.
12/21/2023 4:13:00 PM General

Installed Cellular Modem to replace the DSL service.  

12/15/2023 8:57:00 AM General

All transceiver buffers were cleared the week of 12/11/2023.

12/9/2023 7:36:28 AM ErrorsCleared Noted.
12/7/2023 10:00:00 AM General

Patch file PRO-2023-340-X-010.json was submitted with id 33026949 to fill data gap on 12/6/2023 

11/30/2023 9:21:11 AM ErrorsCleared Noted.
11/25/2023 11:05:15 AM ErrorsCleared Short noise event.
11/14/2023 7:09:56 AM ErrorsCleared The tuning and noise issues were a one time alarm. The tuning on 01 is close to the edge but the systems is operating at 100% efficiencies at this time.
11/13/2023 8:12:00 AM General

The annual Windows 10 LTSC updates were completed last Tuesday, Nov. 7 along with the upgrade of M5 to 2.1.8 . All site DCP's , SByC and non , now run the same version of M5. No outstanding issues to report.