Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

Search by typing either a site name, site code, organization, or site type.

MC2 - McNary Washington Shore Ladder

Status:   Active - Operations Unspecified
Site Type: Adult Fishway  |  Organization: Pacific States Marine Fisheries Commission
General Operational Period: Year Round
Start Date: 4/3/2002 4:30 PM

This site monitors the Washington shore fish ladder at McNary Dam with antennas in weir orifices below the counting window and two antennas at the counting window.

Current Operations

Last File Loaded: MC2-2021-354-X-005.json
Date Last File Loaded: 12/21/2021 9:11 AM
Date Last File Opened: 12/20/2021 4:00 AM
Date Last File Closed: 12/20/2021 5:00 AM
Last Observation Tag:
Last Observation Date:
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Don Warf
dlwarf@psmfc.org
509-735-2773

Data Steward:

Nicole Tancreto
ntancreto@psmfc.org
503-595-3100

Location

Coordinates: 45.939935, -119.299824  |  River Km: 470

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2021
2020 1/17/2020 1:00 PM 1/1/2021 12:00 AM
2019 1/1/2019 12:00 AM 12/16/2019 12:00 PM Ladder dewatered January 2 - 23.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Ladder was dewatered from Jan 2 - 30.
2017 1/27/2017 12:00 AM 1/1/2018 12:00 AM
2016 1/1/2016 12:00 AM 12/1/2016 12:00 AM Ladder dewatered January 4-27.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM Ladder was dewatered January 5-16.
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM Ladder was dewatered January 6-27.
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM Ladder was dewatered from January 6-24.
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM Ladder dewatered for maintenance from February 1-16. Power outage from February 27 - March 1.
2011 1/1/2011 12:00 AM 1/1/2012 12:00 AM The Washington Shore ladder was dewatered for annual maintenance sometime on 15Feb11 and watered up on 26feb11. The picketed leads were pulled for the season on November 1.
2010 1/1/2010 12:00 AM 1/1/2011 12:00 AM The picket leads that crowd fish through the counting window, which had been raised in October, 2009, were lowered into position on March 23, 2010 and remained in place until they were raised on Nov. 1.
2009 1/1/2009 12:00 AM 1/1/2010 12:00 AM The McNary Washington Shore ladder was taken to orifice flow on Dec. 6, and completely dewatered between Dec. 9-17 for winter maintenance.
2008 1/1/2008 12:00 AM 1/1/2009 12:00 AM The McNary Washington Shore fishway was dewatered for annual maintenance between Jan. 2 and Feb. 13, 2008.
2007 1/1/2007 12:00 AM 1/1/2008 12:00 AM
2006 1/1/2006 12:00 AM 1/1/2007 12:00 AM The Washington Shore ladder was dewatered for annual service, and installation of new PIT tag antennas at the counting window, between January 12 and March 31, 2006.
2005 1/1/2005 12:00 AM 1/1/2006 12:00 AM The McNary North Shore adult ladder was dewatered for annual maintenance between January 3-13.
2004 1/1/2004 12:00 AM 1/1/2005 12:00 AM The McNary Washington shore ladder was dewatered (to orifice flow) for annual maintenance at ~1500h on Feb. 15, 2004. The ladder was entirely dewatered at 1030h on Feb. 17, and returned to service at ~10:00am on Feb. 25.
2003 1/1/2003 12:00 AM 1/1/2004 12:00 AM
2002 4/3/2002 4:30 PM 1/1/2003 12:00 AM This was the first year of operation. The McNary Washington Shore ladder watered up on 1/31/02. The production PIT tag interrogation platform began operation at the Washington Shore adult ladder on 04/11/2002 around 16:00 PDT. A temporary detection system operated between 4/3/02 16:30 until 4/11/02 16:00, as follows: Weir 309 - Coil I.D.'s 05, 06; Weir 306 - Coil I.D.'s 09, 0A; Weir 305 - Coil I.D.'s 0B, 0C. Data from this temporary interrogation configuration is included in the MC202101.O file.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/1/2006
End Date:  ----

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to the Dashboard and go to Interrogation Site > Event Logs.

Event Date Event Type Comments
1/26/2022 7:32:20 AM ErrorsCleared We will check the current and the alarm threshold to see if the threshold needs to be adjusted.
1/18/2022 12:51:29 PM SiteUp

According to Site personnel, this ladder really didnt go out of service for this winter. It was at a water maintenance for a short period of time. In service 1-8-2022.

1/18/2022 12:50:26 PM SiteUp

According to Site personnel, this ladder really didnt go out of service for this winter. It was at a water maintenance for a short period of time. In service 1-8-2022.

1/5/2022 7:31:50 AM SiteDown

Ladder was de-watered on 1-4-2022.

1/5/2022 7:31:08 AM SiteDown

Ladder was de-watered on 1-4-2022.

12/20/2021 6:00:00 AM General

Patch file MC2-2021-354-X-005.json was submitted with id 30601634 to fill data gap on 12/21/2021.

12/17/2021 7:08:19 AM ErrorsCleared UPS on 01 replaced 12/16/21.
12/16/2021 2:14:00 PM General

PSMFC was on site to replace the UPS on transceiver 01. The system is now up and running.

12/16/2021 7:25:42 AM ErrorsCleared
12/13/2021 7:29:33 AM ErrorsCleared To be investigated.
12/12/2021 9:48:18 AM ErrorsCleared UPS failure. Will replace next site visit.
12/11/2021 9:20:45 AM ErrorsCleared Noted. UPS died.
12/10/2021 9:00:00 AM General

Patch file MC2-2021-344-X-007.json was submitted with id 30584165 to fill data gap on 12/13/2021.

12/10/2021 8:25:36 AM ErrorsCleared Noted.
12/10/2021 2:00:00 AM General

Patch file MC2-2021-344-X-001.json was submitted with id 30584152 to fill data gap on 12/13/2021.

12/9/2021 7:38:37 AM ErrorsCleared UPS replaced.
12/8/2021 11:03:00 AM General

PSMFC was on site to replace a failed UPS on transceiver 02. There are two of three transceivers on UPS's at this time.

12/5/2021 8:01:21 AM ErrorsCleared
11/27/2021 9:38:00 AM General

Finally was able to reach EOT regarding the internet outage. Should hear back from tec within one hr or I will call them back again. They had no explanation as to why I never received a call back on previous messages left. The ticket # 50405 is being escalated 

11/26/2021 9:58:00 AM General

Called EOT and left messages regarding the outage. Have not heard back yet, will continue to follow up and post when more information is available.

11/15/2021 7:28:41 AM ErrorsCleared Noted.
11/10/2021 8:07:11 AM ErrorsCleared
11/7/2021 1:00:00 AM General

Examination of secondary data shows that no detections occurred during the 60 minute gap on 11-6-2021.

11/4/2021 11:16:04 AM ErrorsCleared
11/3/2021 11:00:00 PM General

Examination of buffered data shows that no detections occurred during the either of the gaps on 11-3-2021.