Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

JCJ - Jack Creek Acc. Pond

Status:   Active - Non-Operational
Site Type: Monitored Fish Release  |  Organization: Pacific States Marine Fisheries Commission
General Operational Period: Seasonally
Start Date: 2/18/2000 8:38 PM

This site monitors volitional releases from Jack Creak acclimation pond which is part of the Cle Elum Supplementation and Research Facility. It operates seasonally from when fish are delivered to the pond until after all fish have been forced out at the end of the volitional release period.

Current Operations

Last File Loaded: JCJ-2022-138-P-014.json
Date Last File Loaded: 5/18/2022 3:03 PM
Date Last File Opened: 5/18/2022 1:00 PM
Date Last File Closed: 5/18/2022 2:00 PM
Last Observation Tag: 3DD.00779823C7
Last Observation Date: 5/18/2022 6:45 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Don Warf
dlwarf@psmfc.org
509-735-2773

Data Steward:

Nicole Tancreto
ntancreto@psmfc.org
503-595-3141

Location

Coordinates: 47.324642, -120.854193  |  River Km: 539.284.017.009

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2022
2021 2/20/2021 12:00 AM 5/14/2021 12:00 PM
2020 2/11/2020 12:00 AM 5/19/2020 12:00 AM
2019 3/14/2019 10:00 AM 5/10/2019 8:00 AM Start date and end dates represent the start and end of volitional release.
2018 2/22/2018 12:00 PM 5/17/2018 1:00 PM Volitional release began March 15.
2017 1/24/2017 12:00 AM 5/18/2017 12:00 AM Fish delivered Jan 24 and pushed out on May 15.
2016 1/25/2016 12:00 AM 5/15/2016 12:00 AM
2015 1/14/2015 12:00 AM 5/8/2015 12:00 AM
2014 1/21/2014 6:00 AM 5/16/2014 12:00 AM Fish delivered to pond on January 21. Site shutdown May 16.
2013 2/4/2013 12:00 AM 5/17/2013 12:00 AM Fish were delivered on February 14. Fish were cleared from site on May 17.
2012 3/19/2012 12:00 AM 5/15/2012 12:00 AM Fish delivered to pond on March 19. Fish were forced out of raceways on May 15.
2011 2/17/2011 12:00 AM 4/7/2011 12:00 AM Fish were ponded into the Jack Creek Acc. Ponds on Feb. 17-18, 2011. Volitional release began on 15mar11. Due to an extraordinary flood event, most fish were evacuated from the facility on 31mar11. Many of these fish were released directly into the Teanaway River without passing through the exit channels containing the PIT tag detectors. All remaining fish were pushed from the ponds, through the exit channels on 07Apr11.
2010 2/16/2010 12:00 AM 5/22/2010 6:00 PM Fish were delivered to the acclimation ponds on or before Feb. 16, 2010. The screens were pulled on March 15 to allow volitional egress. All remaining fish were pushed out on May 11. The facility generators were powered down on May 22 around 18:00 PDT.
2009 2/19/2009 12:00 AM 5/18/2009 12:00 AM Fish were ponded on Feb. 19. The volitional release apparently began on Mar. 20. All remaining fish were forced from the ponds on May 15.
2008 3/10/2008 12:00 PM 5/15/2008 10:00 AM Fish were first ponded at the Jack Creek facility on March 10, 2008. The screens were removed on April 1, to allow volitional egress. Any remaining fish were forced from the raceways on May 14, into the channels above the PIT tag detectors. The channels were drained on May 15.
2007 3/1/2007 12:00 AM 6/1/2007 12:00 PM Fish were ponded into Jack Creek Acc. Facility on March 1 & 2, 2007. Volitional release began on March 15, 2007. All remaining fish were forced from the ponds on May 15. Data collection was interrupted for almost three days between May 18-21, and for almost five days between May 24-29. The facility was dewatered, and data collection terminated, on June 1.
2006 2/13/2006 12:00 AM 5/10/2006 12:00 AM Fish were first delivered to four of the Jack Creek Acclimation Ponds on February 13, 2006. Additional fish were delivered to two other ponds on March 6. Fish were allowed to volitionally exit the ponds beginning on March 15. Jack Creek fish were forced on April 28, 2006 because of intake plugging from high turbid water. The ponds were dewatered on May 10, 2006.
2005 1/26/2005 12:00 AM 4/28/2005 12:00 AM Fish were introduced into the Jack Creek acc ponds on or before January 26, 2005. Volitional release began on March 9. All remaining fish were pushed out on April 28.
2004 2/20/2004 9:00 AM 6/1/2004 12:00 AM Fish were introduced into the Jack Creek Acc. ponds on Feb. 20, per YN staff. Volitional release began on March 15, 2004. All remaining fish were pushed from the ponds on May 14, but water was left running to prevent stranding between the ponds and the river. The last detection occurred just after midnight on May 23. The channel was dry when the computer platform was decommissioned on June 1.
2003 2/11/2003 6:00 AM 5/16/2003 6:00 PM Fish were delivered to the ponds on Feb 11-13. The scheduled release is documented as beginning on March 14. Remaining fish were crowded from ponds on May 15. Last tags were detected in the exit channel on May 16.
2002 2/20/2002 9:00 AM 6/6/2002 12:00 PM Fish delivered 2/20; screens pulled 3/15; no idea when the ponds were emptied.
2001 3/13/2001 12:00 AM 5/30/2001 12:00 PM Screens pulled on 3/15/01; site dewatered by 5/30/01.
2000 2/18/2000 8:38 PM 6/3/2000 10:27 AM First year of operation. Contact YIN for the actual dates of release.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/22/2001
End Date:  ----

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to the Dashboard and go to Interrogation Site > Event Logs.

Event Date Event Type Comments
5/19/2022 7:38:00 AM General

Site down for season. Disabled in Xymon and site notification controls.

 

5/18/2022 3:15:00 PM SiteDown

The site generator was shut down. PSMFC went into the UPS UI and issued a shutdown on both UPS. UPS will need to be turned back on in the spring during GMCs.

3/29/2022 10:22:35 AM ErrorsCleared
3/28/2022 1:22:00 PM General

Installed new UPS for A1 and B1 , bypassed the battery and plugged directly into the surge outlets. All screens have been removed . No other problems to report.

3/28/2022 7:20:00 AM ErrorsCleared
3/23/2022 7:26:32 AM ErrorsCleared Noted.
3/13/2022 9:10:40 AM ErrorsCleared No direct cause for this alarm.
3/12/2022 8:01:20 AM ErrorsCleared These alarms were addressed yesterday during a site visit. The UPS for the transceivers was replaced.
3/11/2022 7:23:55 AM ErrorsCleared The UPS that has failed will be replaced today during a site visit.
3/10/2022 7:17:11 AM ErrorsCleared These alarms will be addressed on Friday during a visit.
3/9/2022 7:07:44 AM ErrorsCleared These alarms will be addressed on Friday during a site visit. The UPS will be replaced.
3/8/2022 7:35:07 AM ErrorsCleared Failed UPS will be replaced on Friday during a site visit.
3/8/2022 7:13:28 AM ErrorsCleared The UPS for transceivers A2 and B2 will be replaced on Friday during a site visit.
3/7/2022 7:16:45 AM ErrorsCleared It appears that the UPS may have failed. It will be replaced during the next site visit.
3/6/2022 7:39:42 AM ErrorsCleared A2 and B2 have lost coms to both PCs. Most likely this is due to a failed UPS. This will be addressed during the next site visit.
3/5/2022 8:56:01 AM ErrorsCleared A2 and B2 have lost coms to both PCs. Most likely this is due to a failed UPS. This will be addressed during the next site visit.
3/2/2022 1:00:00 PM General

M5 was upgraded to v1.8.8 3-2-2022.

3/2/2022 12:00:00 PM General

Upgraded M5 to version 1.8.8 on primary and secondary PCs. 

2/28/2022 12:00:00 PM SiteUp

Fish were delivered 2-28-2022 at 1200.

5/18/2021 7:29:54 AM TASS Site is down for the season.
5/16/2021 8:50:44 AM TASS Noted
5/14/2021 12:00:00 PM SiteDown

The season ended 5-14-2021 at 1200.

5/6/2021 7:17:37 AM TASS Noted.
4/29/2021 7:19:42 AM TASS Noted.
4/29/2021 7:19:42 AM TASS Noted.