Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

Search by typing either a site name, site code, organization, or site type.

ESJ - Easton Acc. Pond

Status:   Active - Operational
Site Type: Monitored Fish Release  |  Organization: Pacific States Marine Fisheries Commission
General Operational Period: Seasonally
Start Date: 3/14/1999 10:10 PM

This site monitors volitional releases from Easton acclimation pond, which is part of the Cle Elum Supplementation and Research Facility. It operates seasonally from when fish are delivered to the pond until after all fish have been forced out at the end of the volitional release period.

Current Operations

Last File Loaded: ESJ-2021-295-P-020.json
Date Last File Loaded: 10/22/2021 8:01 PM
Date Last File Opened: 10/22/2021 6:00 PM
Date Last File Closed: 10/22/2021 7:00 PM
Last Observation Tag: 3DD.00779F06BC
Last Observation Date: 5/15/2021 12:44 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Don Warf
dlwarf@psmfc.org
509-735-2773

Data Steward:

Nicole Tancreto
ntancreto@psmfc.org
503-595-3100

Location

Coordinates: 47.236201, -121.168441  |  River Km: 539.325

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2021
2020 1/21/2020 12:00 AM 5/18/2020 12:00 AM
2019 3/14/2019 10:00 AM 5/14/2019 2:00 PM Start date and end dates represent the start and end of volitional release.
2018 1/29/2018 8:00 AM 5/18/2018 12:00 PM Volitional release began March 15.
2017 1/19/2017 12:00 AM 5/17/2017 12:00 AM Fish were delivered to the pond Jan 19 and pushed out of the raceways May 15.
2016 1/25/2016 12:00 AM 5/13/2016 12:00 AM
2015 1/13/2015 12:00 AM 5/12/2015 12:00 AM
2014 1/6/2014 12:00 AM 5/22/2014 12:00 AM Fish delevered on January 6. Last fish detected on May 22.
2013 2/4/2013 12:00 AM 5/17/2013 8:02 AM Fish were delivered to pond by January 10. Raceways and creek were cleared of fish May 15-17.
2012 1/14/2012 12:00 AM 5/16/2012 12:00 AM Fish delivered sometime in January. Volitional release began on March 15. Remaining fish were forced out of the pond and channel on May 16.
2011 1/13/2011 12:00 AM 5/17/2011 12:00 AM Fish were delivered to the Easton acclimation ponds on January 13. Volitional release began on March 15. Remaining fish were pushed out on May 17.
2010 1/11/2010 12:00 AM 6/1/2010 12:00 AM Fish were ponded on January 11-12, 2010. The screens were pulled on March 15 to allow volitional egress. The facility was shut down on June 1.
2009 1/20/2009 12:00 AM 5/18/2009 12:00 AM Fish were ponded on Jan. 20-21. The volitional release began on March 16. All remaining fish were forced from the ponds on May 15.
2008 1/8/2008 12:00 AM 5/22/2008 3:00 PM Fish were ponded at Easton on January 8. 2008. The volitional release began at 10AM on March 14. Any remaining fish were forced out of the ponds on May 14, into the channels above the PIT tag detectors. All remaining fish in the release channel were pushed throught the PIT tag detectors on May 22, 2008.
2007 1/23/2007 12:00 AM 6/20/2007 12:00 AM Fish were ponded at Easton on Jan. 23-24, 2007. Volitional release began on March 15, 2007. All remaining fish were forced from the ponds on May 15, 2007. The ponds were completely dewatered on June 20, 2007.
2006 1/18/2006 12:00 AM 5/31/2006 12:00 AM Fish were transferred into the Easton Acclimation Ponds on Jan. 18-19, 2006. Fish were allowed to volitionally exit the ponds beginning on March 15. All fish were flushed out on May 15, 2006 and screens were pulled to allow for volitional release. The Easton Acc Pond was dewatered on May 31, 2006.
2005 1/26/2005 12:00 AM 4/28/2005 12:00 AM Fish were introduced into the Easton acc ponds on or before January 26, 2005. Volitional release began on March 9. All remaining fish were pushed out on April 28.
2004 1/21/2004 9:00 AM 5/21/2004 12:00 AM Fish were introduced into the Easton Acc. ponds on 1/21/04, per YN staff. Volitional release began on March 15, 2004. All remaining fish were pushed from the ponds on May 14, but water was left running until May 21 to prevent stranding between the ponds and the river.
2003 2/5/2003 6:00 AM 3/29/2003 6:00 AM Fish were delivered to the ponds on Feb 5-6. Fish were forced out on March 28.
2002 1/28/2002 9:00 AM 6/6/2002 12:00 PM Fish delivered 1/15; screens pulled 3/15; no idea when the ponds were emptied.
2001 1/22/2001 8:00 AM 5/30/2001 12:00 PM Screens pulled on 3/16/01; site dewatered by 5/30/01.
2000 1/28/2000 12:34 PM 6/5/2000 5:09 AM First year of operation. Contact YIN for the actual dates of release.
1999 3/14/1999 10:10 PM 5/24/1999 10:13 AM Dates and times based on first/last reported detections.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/22/2001
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to the Dashboard and go to Interrogation Site > Event Logs.

Event Date Event Type Comments
9/24/2021 10:38:53 AM ErrorsCleared
9/24/2021 10:14:52 AM ErrorsCleared Alarms due to TASS alert testing. The Serial to ethernet connection for A1 was temporarily disconnected. Services on primary and secondary PC's have been restarted to restore the connection. Tested communication from both PC's to all transceivers. 
9/17/2021 7:09:09 AM ErrorsCleared
9/16/2021 7:56:48 AM ErrorsCleared To be investigated.
8/31/2021 3:14:00 PM General

Installed new IPC DCP panel and removed all old PC's. DCP Enclosure will be replaced next week due to the shallow depth of the current along with repairing broken fiber ends .

 

2/9/2021 7:00:00 AM SiteUp ESJ up Up 2-9-2021 0700
5/18/2020 12:00:00 AM SiteDown ESJ down
2/26/2020 12:59:52 PM General A site GMC was performed today. All systems were checked and adjusted fro tuning and noise. No problems were found during this GMC.
1/21/2020 12:00:00 AM SiteUp ESJ up Fish Delivered 1/21/2020
7/31/2019 1:34:34 PM General Remotely rebooted the primary PC at ~0950 to get the M4 file creation times back to on the hour.
5/14/2019 2:00:00 PM SiteDown ESJ down The Channel was cleared of all fish.
3/14/2019 10:00:00 AM SiteUp ESJ up The screens were pulled today
1/18/2019 9:11:04 AM General We were informed by YN biologist Charlie Strom the site was populated with fish on Monday and Tuesday 1/14 and 1/15/19.
5/18/2018 12:00:00 AM SiteDown ESJ down Channels were walked fish cleared.
4/11/2018 7:00:00 AM General For unknown reasons, the primary PC closed and submitted file ESJ-2018-101-P-002 after approximately one minute. Meanwhile the PC continued to interrogate to file ESJ-2018-101-P-002, then closed and submitted it at the next automated interval. The second version of the file was rejected due to identical names. File ESJ-2018-101-X-002 was created from the second file and compared to data from the secondary PC for accuracy. PTAGIS will continue to monitor, no further problems to report.
4/9/2018 3:54:39 PM General The platform was remotely rebooted for M4 file maintenance. File ESJ-2018-099-X-014 was created on the secondary PC and covers the gap in time the primary PC was down. No problems to report.
3/19/2018 7:29:00 AM General PSMFC was on site to investigate the cause for the transceivers poor efficiency. It was discovered that the transceiver had been placed into "standby" mode on Friday afternoon. There was no activity from PSMFC staff to make this occur and all indications show that the action came from the transceiver. This has never happened at any of the acclamation sites in the Past so PSMFC will be keeping a close eye on future operations to ensure that this does not occur again.
3/15/2018 12:22:00 PM General PSMFC was informed yesterday by Charlie Strom that the screens were pulled and the volitional release has begun for this season.
2/23/2018 8:36:10 AM TASS Noted
2/22/2018 10:01:36 AM TASS To be addressed during today's site visit.
2/21/2018 7:39:35 AM TASS Noted
1/29/2018 8:00:00 AM SiteUp ESJ up All fish have been delivered.
6/1/2017 9:07:44 AM General The platform was remotely rebooted 6-1-2017. Any file gaps are inconsequential as the site is dewatered.
5/17/2017 12:00:00 AM SiteDown ESJ down Charlie indicated that the fish were pushed out on May 15th and the creeks were walked on water shut off on the 17th.
3/31/2017 11:07:14 AM General A site GMC was performed. All transceivers were checked for tuning and noise. test sticks were passed through both monitors with 100% detection. Alerts were cleared on both PC's. No problems were discovered during this visit.