Interrogation Site Metadata

GOJ - Little Goose Dam Juvenile

Status:   Active - Operations Unspecified
Site Type: Juvenile Fish Bypass Facility  |  Organization: Pacific States Marine Fisheries Commission
General Operational Period: Seasonally
Start Date: 4/7/1987 1:20 PM

This site monitors the juvenile bypass system and fish facility at Little Goose Dam. The site operates seasonally for juvenile outmigration and includes antennas in the full flow bypass flume that is often active before and after the sampling facility each year. Separation by Code (SbyC) is also available to allow researchers to selectively divert PIT-tagged fish to two separate sample tanks for additional sampling. SbyC acts on all PIT-tagged fish by default to return them to the river, rather than be collected for transportation with untagged run-of-river fish. Researchers can use SbyC to override that default action and instead allow PIT-tagged fish to be treated like the untagged population.

Current Operations

Last File Loaded: GOJ-2022-177-P-006.xml
Date Last File Loaded: 6/26/2022 7:20 AM
Date Last File Opened: 6/26/2022 5:03 AM
Date Last File Closed: 6/26/2022 6:03 AM
Last Observation Tag: 3DD.003D9CF9A8
Last Observation Date: 6/26/2022 5:55 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Don Warf
dlwarf@psmfc.org
509-735-2773

Data Steward:

Nicole Tancreto
ntancreto@psmfc.org
503-595-3141

Location

Coordinates: 46.582381, -118.031607  |  River Km: 522.113

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2022
2021 3/12/2021 12:00 AM 11/1/2021 12:00 PM Full flow watered up March 12. The JFF watered up March 25 and collection for sampling began April 1. Collection for transportation begain April 23. Every day barging ran from April 24 - May 16, with every-other-day barging beginning on May 17 and ending on June 20. Collection for every other-day trucking began July 4, with the first truck leaving on July 5 and ending on September 30, along with sampling.
2020 3/12/2020 9:00 AM 12/21/2020 12:31 PM Watered up in primary bypass March 12. Collection for sampling began April 1. Collection for every day barging began April 23. Every other day barging from May 19 - June 21. Truck transport ran every other day from August 1 through end of sampling on November 1. Full flow was dewatered for the season December 21.
2019 3/25/2019 9:00 AM 12/19/2019 11:00 AM The JFF was watered up March 27 and remained in primary bypass until 07:00 PDT on April 1, when collection for sampling began. Sampling occurred every other day April 2 - 23. Collection for transportation by barge and everyday sampling began April 23 at 07:00 PDT. Barge tansportation ended on July 30 and truck transportation begain on August 1. Transportation by truck and sampling ended on November 1. On April 24 a pipe failure caused fish to be loaded to raceways rather than direct to barge; raceway capacity was reached at 0215 and 0415 on the A and B sides respectively, forcing fish to routed to the river via secondary bypass. An error in gate settings caused fish to be unintentally bypassed back to the river from April 24 2300 - April 25 0300.
2018 2/20/2018 12:00 AM 1/1/2019 12:00 AM The JFF watered up February 20 and was placed into primary bypass. Sampling ran March 1 - November 1. Barge transportation ran April 22 - August 14. Truck transportation ran from August 16 - November 2. Sampling and truck transporation were suspended from September 15 - October 13 because the mortality rate exceeded 10% for 3 consecutive days.
2017 3/20/2017 12:00 AM 12/20/2017 12:00 AM The full flow watered up Mar 20. Collection for sampling started Apr 1. Collection for transportation started May 1. Sampling and transportation concluded Nov 2. Full flow was dewatered Dec 20.
2016 3/22/2016 11:00 AM 12/21/2016 9:00 AM The facility watered up in primary bypass on March 22 and switched to secondary bypass on April 9. The JFF was shut down for the season on November 11 and the full flow was dewatered on December 21.
2015 3/24/2015 12:00 AM 12/21/2015 12:00 AM Full flow watered up March 24. JFF watered up April 1. Collection for transport started on May 1 at 0700. Sampling and transportation conluded October 31. Full flow was dewatered December 21.
2014 3/17/2014 12:00 AM 12/16/2014 12:00 AM Full flow watered up March 17. JFF operated March 26-October 31; collection for transport started on May 1. Full flow dewatered December 16.
2013 3/19/2013 10:45 AM 12/17/2013 10:30 AM Watered up in primary bypass on March 19. Secondary bypass will occur for 24 hours every 5 days starting on April 2 at 0700. Collection for transportation ran from May 2 - October 31, when the JFF was dewatered and the facility switched into primary bypass. The full flow was dewatered on December 17.
2012 3/19/2012 2:00 PM 12/18/2012 10:00 AM The juvenile system watered up in primary bypass on March 19. The facility switched to secondary bypass (water over the separator) from April 1-5. Every 5th day the facility switched to secondary bypass to collect a 24 hour fish sample (April 9, 14, 19, 24, and 29). Collection for barge transportation began on May 3 and ended on October 31; the facility switched in to primary bypass at that time. Full flow detection continued until December 18, when the primary bypass flume was dewatered for the season.
2011 3/22/2011 1:30 PM 12/19/2011 12:00 PM The LGS JFF watered up in primary bypass on March 22, 2011. The facility switched to secondary bypass for 24 hours (0700-0700 PDT) on April 3-4 to collect a "condition" sample. Additional scheduled sample dates are April 8-9, 13-14, 18-19, 23-24, and 28-29. The facility switched into transport mode on May 5 at 0700. The facility switched back into primary bypass mode on October 31. The primary bypass flume was dewatered for the season on December 19.
2010 3/8/2010 10:30 AM 12/16/2010 9:00 AM The juvenile fish bypass was watered up for approximately three hours on March 8 to test the new primary bypass outfall pipe. The Primary Bypass pipe was watered up for the season on March 23. The facility switched to secondary bypass/collection for short periods on April 5, 11, 15, 20, and from April 25-27, before settling into secondary bypass/collection mode on April 30. The facility reverted to primary bypass mode on Oct. 31. The entire juvenile bypass system was dewatered on December 16.
2009 3/25/2009 9:00 AM 12/16/2009 12:00 PM The Little Goose juvenile fish bypass watered up in primary bypass on March 25, 2009. The facility was in secondary bypass/collection mode from April 1 until October 31. The facility remained in primary bypass mode from October 31 until the bypass was dewatered on December 16.
2008 4/1/2008 6:00 AM 11/1/2008 6:00 AM A scheduled power outage at 7:00 AM (pst) on April 23 extended unexpectedly and essentially uninterrupted until 7:27 AM (pst) on April 25. The facility switched to primary bypass on Nov. 1, after which no PIT tag detection was possible.
2007 4/1/2007 6:00 AM 10/31/2007 12:00 PM The LGS juvenile fish facility (JFF) watered-up at 0700h (PDT) on April 1, 2007, in secondary bypass mode. Fish were bypassed directly back to the river until May 8, when transportation activities commenced. The facility switched back to primary bypass on October 31. No PIT tag detection is possible during primary bypass.
2006 4/1/2006 7:00 AM 10/31/2006 7:30 AM The facility watered-up at 0700h on April 1, 2006. The facility operated in secondary bypass mode until 0700 on April 24, when fish were first routed to the raceways for subsequent transportation. LGS shifted back to primary bypass at 7:30 AM on October 31. There was no PIT tag detection capability in the primary bypass route at LGS in 2006, so there was no way to track any PIT-tagged fish diverted from the LGS turbine intakes after this date.
2005 4/1/2005 6:00 AM 10/31/2005 7:00 AM
2004 4/1/2004 7:00 AM 10/31/2004 7:00 AM
2003 4/1/2003 7:00 AM 10/31/2003 7:00 AM
2002 4/1/2002 7:00 AM 10/31/2002 12:00 PM
2001 4/1/2001 7:00 AM 10/31/2001 7:00 AM
2000 4/1/2000 7:00 AM 10/31/2000 7:00 AM First year of ISO detection.
1999 4/1/1999 12:00 AM 9/1/1999 12:00 AM Early shutdown due to ISO conversion; facility transported fish through October.
1998 4/1/1998 7:00 AM 11/1/1998 7:00 AM
1997 3/19/1997 1:31 PM 11/3/1997 1:11 PM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1996 3/19/1996 7:59 PM 10/28/1996 3:15 PM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1995 3/30/1995 12:15 PM 11/1/1995 7:35 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1994 3/18/1994 1:16 PM 11/1/1994 7:39 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1993 4/15/1993 6:53 AM 9/30/1993 11:08 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1992 4/13/1992 11:55 AM 9/27/1992 11:17 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1991 4/6/1991 8:59 AM 8/31/1991 6:17 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1990 4/14/1990 2:49 AM 7/16/1990 9:56 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1989 4/4/1989 7:03 AM 7/9/1989 1:11 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1988 4/6/1988 12:11 PM 7/10/1988 4:09 PM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1987 4/7/1987 1:20 PM 6/15/1987 3:30 PM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/24/2021
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

This displays the last 25 events, to see the full history, log in to the Dashboard and go to Interrogation Site > Event Logs.

Event Date Event Type Comments
6/23/2022 7:16:07 AM ErrorsCleared
6/19/2022 7:18:01 AM ErrorsCleared Short noise event.
6/10/2022 7:26:29 AM ErrorsCleared Noted.
6/7/2022 1:00:00 PM GMC

On site for weekly gate checks. Pressure for both gates were set to 100 PSI. Slight adjustment for the open and close travel times were made to achieve optimal slow close positioning. The gates have been performing above 98% in the past 24 hours. A gate's seems to have a thumping noise coming from the 3 way solenoid. Site personnel was notified.

6/7/2022 7:49:51 AM ErrorsCleared Short noise event.
6/5/2022 8:44:56 AM ErrorsCleared
6/3/2022 7:23:32 AM ErrorsCleared
6/2/2022 7:24:37 AM ErrorsCleared Alarms were generated during a site GMC visit.
6/1/2022 12:30:00 PM GMC

On site for weekly gate checks. Pressure for both gates were set to 100 PSI. Slight adjustment for the open and close travel times were made to achieve optimal slow close positioning. The gates have been performing above 98% in the past 24 hours. A gate's seems to have a thumping noise coming from the 3 way solenoid. Site personnel was notified.

6/1/2022 11:46:00 AM GMC

Checked and tuned transceivers.
Cleared M4 alerts.

FF 02 is a bit noisy. Didn't have a transceiver to try. Antenna shield has water pooled on the floor and the foam under the coil is wet. This could possibly be cause of increased noise level. Will try transceiver during next site visit.

6/1/2022 8:11:25 AM ErrorsCleared
5/31/2022 7:12:55 AM ErrorsCleared
5/30/2022 9:49:33 AM ErrorsCleared Noted.
5/27/2022 8:15:16 AM ErrorsCleared Noted.
5/26/2022 7:19:08 AM ErrorsCleared
5/24/2022 1:00:00 PM GMC

On site for weekly gate checks. Pressure for both gates were set to 100 PSI. Slight adjustment for the open and close travel times were made to achieve optimal slow close positioning. The gates have been performing above 98% in the past 24 hours. A gate's seems to have a thumping noise coming from the 3 way solenoid. Site personnel was notified.

5/24/2022 11:30:00 AM GMC

Checked and tuned transceivers.
Cleared M4 alerts.

5/23/2022 12:43:30 PM ErrorsCleared Noted.
5/22/2022 7:16:34 AM ErrorsCleared Short noise event.
5/21/2022 7:18:15 AM ErrorsCleared Noted.
5/19/2022 7:04:18 AM ErrorsCleared Short noise event.
5/17/2022 7:27:00 AM General

Startouch is having issues with an upstream radio causing the network outage. Should be fixed within the hour.

5/10/2022 12:30:00 PM General

On site for weekly gate checks. Pressure for both gates were set to 100 PSI. Slight adjustment for the open and close travel times were made to achieve optimal slow close positioning. The gates have been performing above 98% in the past 24 hours. A gate's thumping seems to have returned and it sounds like it is coming from the solenoids themselves. Site personnel will be alerted.

5/6/2022 7:44:12 AM ErrorsCleared
5/5/2022 7:18:15 AM ErrorsCleared Noted.