Interrogation Site Metadata
JDJ - John Day Dam Juvenile
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 5/14/1992 8:26 PM
This site monitors the John Day Dam smolt bypass and sampling facility. The site operates seasonally for juvenile outmigration and includes antennas in the full flow bypass flume that is often active before and after the sampling facility each year. Separation by Code (SbyC) is also available to allow researchers to selectively divert PIT-tagged fish to two separate sample tanks for additional sampling.
Current Operations
Last File Loaded: | JDJ-2024-114-P-023.json |
Date Last File Loaded: | 4/24/2024 12:03 AM |
Date Last File Opened: | 4/23/2024 10:00 PM |
Date Last File Closed: | 4/23/2024 11:00 PM |
Last Observation Tag: | 3DD.003E2B9225 |
Last Observation Date: | 4/23/2024 10:55 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 3/31/2023 9:00 AM | 11/30/2023 11:00 AM | |
2022 | 3/28/2022 1:00 PM | 12/7/2022 8:00 AM | Full flow operated March 28 - December 7. Juvenile fish facility operated April 1 - September 1. |
2021 | 2/23/2021 12:00 AM | 12/2/2021 12:00 AM | The full flow operated February 23 - December 2. The JFF operated March 2 - November 15. |
2020 | 3/9/2020 10:00 AM | 12/1/2020 12:00 PM | |
2019 | 3/11/2019 9:00 AM | 12/5/2019 2:30 PM | Full flow watered up March 11. Smolt monitoring ran from 0700 March 13 to 1000 September 1. Full flow dewatered 1430 December 5. |
2018 | 2/27/2018 12:00 AM | 11/29/2018 12:00 AM | Full flow watered up February 27. JMF watered up and and began collections for smolt monitoring February 27. Smolt monitoring concluded September 14. |
2017 | 3/28/2017 12:00 AM | 11/20/2017 12:00 AM | Full flow was watered up from March 28 - November 20. Collection for sampling ran from April 1 - September 14. |
2016 | 3/22/2016 12:00 AM | 12/5/2016 12:00 AM | Smolt monitoring operations ran from April 1-September 14. |
2015 | 3/24/2015 12:00 AM | 11/30/2015 12:00 AM | JFF watered up March 24 and went into secondary bypass and started sampling March 31. Sampling ended September 15 and JFF went into primary bypass. Full flow dewatered November 30. |
2014 | 3/25/2014 12:00 AM | 11/24/2014 12:00 AM | JFF watered up March 25 and went into secondary bypass and started sampling March 31. Full flow dewatered November 24. |
2013 | 3/28/2013 8:00 AM | 12/16/2013 12:00 PM | The full flow bypass watered up on March 28. The facility watered up on April 1. The facility was dewatered on September 15 and the full flow was dewatered on December 16. |
2012 | 3/29/2012 10:00 AM | 11/29/2012 9:00 AM | The juvenile facility watered up in primary bypass on March 29. Sampling started on April 1. The facility went into primary bypass on September 15 and dewatered on November 29. |
2011 | 3/30/2011 12:30 PM | 11/17/2011 9:00 AM | The JDA bypass watered up in primary mode (PIT tag detections through the full-flow antennas only) on March 30, 2011. The juvenile monitoring facility (JMF) began operating in secondary bypass mode at 0600 PST on March 31, 2011. The facility switched into primary bypass on September 15. Full flow was de-watered on November 17. |
2010 | 3/30/2010 10:00 AM | 11/29/2010 12:00 AM | The facility watered up in primary bypass on March 30, and switched to secondary bypass (and sample) at 7AM (PDT) on March 31. JDJ switched back to primary bypass at 7AM (PDT) on Sept. 15. The primary bypass was dewatered for the winter on Nov. 29. |
2009 | 3/30/2009 4:00 PM | 11/30/2009 5:00 PM | The JDA SMF was watered-up in primary bypass mode at approximately 1700 hrs (PDT) on 3/30/2009, and went into sample mode (secondary bypass) at approximately 0700 hrs (PDT) on 3/31/2009. Following the conclusion of the sampling season on Sept. 15, the facility returned to primary bypass mode until the full-flow pipe was dewatered on Nov. 30, 2009. |
2008 | 4/1/2008 12:00 PM | 12/2/2008 12:00 PM | The bypass pipe and juvenile fish sampling facility both watered up on April 1, 2008. The facility switched to primary bypass on Sept. 15. In primary bypass, PIT-tagged fish are detected only at the full-flow antennas above the switch gate. The Full Flow Flume was de-watered on December 2, 2008. |
2007 | 4/2/2007 3:00 PM | 9/13/2007 3:00 PM | The John Day Juvenile Monitoring Facility (JMF) watered-up at 3PM on April 2, 2007. The new full flow antenna group was activated on May 10. The entire bypass system, including the JMF, was dewatered for the year on September 13, 2007. |
2006 | 4/3/2006 7:00 AM | 9/14/2006 8:30 AM | |
2005 | 4/1/2005 9:30 AM | 9/15/2005 6:00 AM | |
2004 | 4/1/2004 7:00 AM | 9/15/2004 6:00 AM | |
2003 | 3/31/2003 3:00 PM | 9/15/2003 6:00 AM | |
2002 | 3/18/2002 3:00 PM | 9/16/2002 7:00 AM | |
2001 | 3/29/2001 4:30 PM | 9/17/2001 6:00 AM | |
2000 | 4/3/2000 7:00 AM | 10/31/2000 7:00 AM | First year of ISO detection. |
1999 | 4/1/1999 12:00 AM | 10/4/1999 12:00 AM | Early shutdown due to ISO conversion; facility sampled fish through October. |
1998 | 4/8/1998 7:00 AM | 10/29/1998 7:00 AM | |
1997 | 4/4/1997 4:26 AM | 9/6/1997 5:17 AM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1996 | 4/16/1996 1:51 PM | 9/8/1996 9:18 PM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1995 | 4/6/1995 12:35 PM | 9/26/1995 10:24 PM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1994 | 4/22/1994 2:13 AM | 9/20/1994 11:12 PM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1993 | 4/5/1993 4:40 PM | 9/25/1993 7:31 AM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
1992 | 5/14/1992 8:26 PM | 10/12/1992 6:36 PM | The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
FULL FLOW BYPASS | 01 | 01 |
FULL FLOW BYPASS | 02 | 02 |
FULL FLOW BYPASS | 03 | 03 |
FULL FLOW BYPASS | 04 | 04 |
SBYC SEPARATOR GATE | A1 | A1 |
SBYC SEPARATOR GATE | A2 | A2 |
SBYC SEPARATOR GATE | A3 | A3 |
SBYC SEPARATOR GATE | A4 | A4 |
RIVER EXIT | 81 | 81 |
RIVER EXIT | 82 | 82 |
RIVER EXIT | 83 | 83 |
RIVER EXIT | 84 | 84 |
SAMPLE ROOM | 51 | 51 |
SAMPLE ROOM | 52 | 52 |
SAMPLE ROOM | 53 | 53 |
SAMPLE ROOM | 54 | 54 |
SBYC GATE | C1 | C1 |
SBYC GATE | C2 | C2 |
SBYC GATE | C3 | C3 |
SBYC GATE | C4 | C4 |
SBYC EAST TANK | E1 | E1 |
SBYC EAST TANK | E2 | E2 |
SBYC WEST TANK | F1 | F1 |
SBYC WEST TANK | F2 | F2 |
SAMPLE / SBYC EXIT | 91 | 91 |
SAMPLE / SBYC EXIT | 92 | 92 |
SAMPLE / SBYC EXIT | 93 | 93 |
SAMPLE / SBYC EXIT | 94 | 94 |
ADULT FISH RETURN | 61 | 61 |
ADULT FISH RETURN | 62 | 62 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
This displays the last 25 events, to see the full history, log in to theĀ Event Logs.
Event Date | Event Type | Comments |
---|---|---|
4/21/2024 9:02:25 AM | ErrorsCleared | Noted. |
4/10/2024 12:00:00 PM | GMC |
Checked and tuned transceivers. No issues were discovered during this check. |
4/10/2024 7:10:11 AM | ErrorsCleared | Noted. |
4/1/2024 12:00:00 PM | General |
I talked to site personnel and they explained to me that they were having air pressure issues that lead to the gate alarms on the 2-Way gate and the 3-Way gate. |
3/27/2024 3:48:00 PM | GMC |
Performed site GMC, no problems to report |
3/27/2024 3:48:00 PM | GMC |
Performed site GMC, no problems to report |
3/21/2024 9:09:56 AM | ErrorsCleared | Noted. |
3/19/2024 9:09:00 AM | SiteUp | |
3/19/2024 7:00:00 AM | General |
Good morning,
Please find attached the JDA weekly status report for week ending 3/16/24.
|
3/18/2024 9:08:00 AM | SiteUp | |
3/18/2024 7:00:00 AM | General |
Good morning,
Please find attached the JDA weekly status report for week ending 3/16/24.
|
3/18/2024 7:00:00 AM | General |
Good morning,
Please find attached the JDA weekly status report for week ending 3/16/24.
|
12/18/2023 7:38:21 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/17/2023 8:24:29 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/16/2023 10:25:57 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/15/2023 8:57:00 AM | General |
All transceiver buffers were cleared the week of 12/11/2023. |
12/15/2023 7:30:33 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/14/2023 8:46:39 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/12/2023 7:52:06 AM | ErrorsCleared | Power outage. |
12/11/2023 9:54:13 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/10/2023 8:21:15 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/9/2023 7:35:32 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/8/2023 7:16:59 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/7/2023 6:55:29 AM | ErrorsCleared | Re-tune transceiver on next visit. |
12/6/2023 6:56:19 AM | ErrorsCleared | Re-tune transceiver on next visit. |