Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

GRJ - Lower Granite Dam Juvenile

Status:   Active - Operational
Site Type: Juvenile Fish Bypass Facility  |  Organization: Pacific States Marine Fisheries Commission
General Operational Period: Seasonally
Start Date: 3/25/1988 1:28 PM

Lower Granite Dam Juvenile Fish Bypass/Transportation Facility

Current Operations

Last File Loaded: GRJ-2024-121-P-016.json
Date Last File Loaded: 4/30/2024 5:04 PM
Date Last File Opened: 4/30/2024 3:00 PM
Date Last File Closed: 4/30/2024 4:00 PM
Last Observation Tag: 3DD.003E01E49D
Last Observation Date: 4/30/2024 3:55 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Don Warf
dlwarf@psmfc.org
509-735-2773

Data Steward:

Nicole Tancreto
ntancreto@psmfc.org
503-595-3141

Location

Coordinates: 46.660394, -117.436261  |  River Km: 522.173

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 3/15/2023 11:00 AM 12/14/2023 9:00 AM Full flow watered up March 5. Daily collection for sampling started March 25 0700, with first sample occurring on March 26. Fish collected April 18-19 were transported by barge on April 20 for NMFS survival research. Collection for transportation started 0700 April 23, first every-other-day barge departed on April 24. On May 3, 8156 fish were bypassed instead of transported because the raceways were at capacity. Transportation stopped after the June 15 barge due to the failure of a loading boom. All fish were bypassed starting on June 16, the last two barge trips scheduled for June 17 and 19 were cancelled due to a broken loading boom. Truck transportation ran from 0700 August 1 until 0700 November 1. Facility dewatered November 1, full flow dewatered December 14.
2022 3/14/2022 9:00 AM 12/19/2022 9:00 AM The full flow watered up March 14 and the juvenile fish facility watered up March 25 and collection for sampling began. Fish collected for transportation study April 11, 12, 18, and 19 were barged. Every-other-day barging started April 24, every day barging occurred from May 16 - 24, every-other-day barging resumed May 26 - June 19. Fish collected for barging on June 13 were bypassed to the river due to unsafe loading conditions. Every-other-day truck transport ran August 1 - November 1. Condition sampling ended on November 1. The full flow was watered down Decemeber 19.
2021 2/22/2021 10:30 AM 11/1/2021 12:00 PM Full flow watered up February 22. Collection for sampling began March 1. Collection for NMFS transportation research April 13 and 14; barge left on April 15. Collection for transport started 0700 April 23, first barge left April 24. Every day barging ran until May 19. Every other day barging ended on June 20. Collection for every other day truck transport began on July 2 in response to warming watere temparatures in the Snake River. Genearul truck transport started August 1 and ended November 1, when smolt monitoring also ended.
2020 2/20/2020 12:00 AM 12/21/2020 12:00 AM Full flow watered up February 20. The facility watered up and collection for sampling begain March 1. Collection for barging began April 23. Every other day barging ran from May 20 - June 21. Collection for truck transport ran from August 2 - November 1 when sampling ended for the season. The full flow was dewatered on December 21.
2019 3/8/2019 12:00 AM 12/19/2019 11:00 AM Facility operated in emergency bypass and was commissioning the PDW from March 8 - 16. During that time period, the full flow may have water running through it at times. The full flow watered up for the season on March 16. The JFF watered up and collection for sampling began March 25 at 07:00 PDT. Fish were transported by barge on April 4, 11, 18, 24 for NMFS transportation study. Collection for general transportation started April 23 at 07:00 PDT. Barge transportation ended on July 30 and truck transporation began on August 1. Transportation by truck and sampling ended on November 1. Flex spill ran from 0001 April 3 through 0001 June 21. From 0700 June 24 to 0700 June 26 all fish were bypassed (not transported) due to Ice Harbor Dam lock outage.
2018 3/15/2018 12:00 AM 11/15/2018 12:00 AM The full flow antenna installation was completed on March 15. The facility operated in emergency bypass from approximately 16:00 March 28 until 09:15 on March 29. Collection for sampling ran April 1 - October 31. Transportation by barge ran April 23 - August 14. Transportation by truck ran August 16 - October 31. JFF went to primary bypass at 0700 on July 17, then emergency bypass at 1130. Sampling and collection for transport resumed at 1545 on July 19. Flume testing was conducted on August 7 and 8; facility was in primary bypass from 0920-1031 and 1242-1314 on the 7th; and from 1223-1300 and 1418-1445 on the 8th.
2017 3/25/2017 12:00 AM 8/2/2017 12:00 AM Collection for sampling started Apr 1, transportation started May 1. Transportation paused from Jul 20-24, and concluded for the season on Aug 2.
2016 3/21/2016 12:00 AM 11/17/2016 12:00 AM Facility was operational in secondary bypass on March 21. Collection for sampling began on March 25. Collection for transportation began on May 1. Sampling and truck transportation concluded for the season on October 31, and the facility was placed in secondary bypass. Facility was dewatered November 17.
2015 3/17/2015 12:00 AM 12/2/2015 12:00 AM JFF went into secondary bypass March 17. Collection for transport started May 1. Sampling and transportation ended October 31. JFF dewatered December 2.
2014 3/20/2014 12:00 AM 11/14/2014 12:00 AM Collection for transport started on May 1. Site went to primary bypass October 31-November 2. On May 8, a release plunger on one of the barges failed and the fish were released into the LGR basin on May 13.
2013 3/18/2013 8:00 AM 12/6/2013 2:00 PM The facility watered up in secondary bypass mode on March 18. Sampling began on March 25. Collection for transport began on April 27. Collection for sampling and transportation concluded on October 31 and the facility was placed in secondary bypass. Site was dewatered on December 6.
2012 3/22/2012 8:30 AM 12/20/2012 8:00 AM The collection gallery was watered up on March 21 and the facility was in primary bypass until March 22, when the JFF was put into in secondary bypass (water over the separator and through the A and B gates). SMP sampling began on March 26. General transportation began on May 1. Sampling and transportation ended on October 31. The JFF was dewatered on December 20.
2011 3/23/2011 7:00 AM 12/15/2011 8:20 AM The LGR JFF watered up in primary bypass (water over the separator and out the adult return flume) on March 23. The facility switched to secondary bypass mode (water and fish through the A- and B-Separator gates) at 0600 pst on March 25. The facility switched back into primary bypass mode on December 15.
2010 3/25/2010 6:00 AM 12/16/2010 8:00 AM The LGR JBS separator was watered up on March 25, with fish routed through the various sample, bypass, and collection sub-systems. The site reverted to secondary bypass (water over the separator, no sample, fish returned to the river via the adult exit [F-antennas] or through the A- and B-gates and out to the river via E-Gate) on Oct. 31. Due to freezing temperatures, the facility reverted to primary bypass mode (no PIT tag detection) on Nov. 22, and returned to secondary bypass on Nov. 25. The facility was dewatered for the winter on Dec. 16.
2009 3/25/2009 6:00 AM 12/5/2009 12:00 PM The Lower Granite JFF watered up in bypass mode on March 25, 2009. Due to heavy loads of fine debris, the facility switched into primary bypass from ~8AM on Friday, May 22 until ~8AM on Monday, May 25. The facility switched from collection/sampling to full bypass mode on October 31. Due to freezing conditions, the facility switched to primary bypass on Dec. 5, and dewatered for the season on Dec. 16.
2008 3/25/2008 6:00 AM 12/13/2008 12:00 PM The LGR juvenile fish facility watered up at 7AM (PDT) on March 25. Sampling activities concluded on November 1, but the site remained in secondary bypass until December 13, and then dewatered for the year.
2007 3/25/2007 7:00 AM 10/31/2007 12:00 PM GRJ started putting water over the separator at 7AM (PDT) on March 25, 2007. There was no general facility transportation prior to May 1, but there were limited transportation activities, specifically for research. Any PIT-tagged or untagged fish diverted into Raceway 10 prior to May 1 were transported along with the research fish. The facility was dewatered for the season on October 31.
2006 3/25/2006 7:00 AM 12/16/2006 7:30 AM The LGR collection gallery was watered up March 20 and the facility was in primary bypass mode from March 20 until March 25 at 0700h, when the fish facility began smolt collection. All fish were bypassed back to the river until 0700h on April 20, when the facility began collecting for transportation. The first barge of the 2006 season left Lower Granite Dam on April 21, on an every-other-day (EOD) schedule. Every day barging began April 24. For 36 hours from April 25-27 the COE direct loaded 208,913 fish into barges. Transportation and sampling activities concluded at 0700h on Nov. 1; after that, all fish were routed to the river through the East Raceway/River Exit monitor, in order to audit PIT tag detections. Due to freezing conditions, the facility switched to primary bypass from 0830h on Nov. 28 until 0730h on Nov. 30; PIT tags are not detected in the primary bypass. Water stopped flowing over the separator on December 16, and the facility was dewatered on December 18.
2005 3/25/2005 6:30 AM 10/31/2005 7:00 AM
2004 3/25/2004 7:00 AM 10/31/2004 7:00 AM
2003 3/25/2003 7:00 AM 10/31/2003 7:00 AM
2002 3/25/2002 7:00 AM 10/31/2002 7:00 AM
2001 3/25/2001 7:00 AM 10/31/2001 7:00 AM
2000 3/25/2000 7:00 AM 10/31/2000 7:00 AM First year of ISO detection.
1999 3/25/1999 12:00 AM 9/1/1999 12:00 AM Early shutdown due to ISO conversion; facility transported fish through October.
1998 3/26/1998 7:14 AM 11/1/1998 7:45 AM
1997 3/17/1997 12:11 PM 11/3/1997 8:11 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1996 3/29/1996 1:52 PM 11/2/1996 12:04 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1995 3/28/1995 11:51 AM 11/1/1995 7:39 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1994 4/2/1994 3:36 PM 11/1/1994 7:26 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1993 4/12/1993 7:42 PM 10/25/1993 11:25 PM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1992 4/2/1992 5:21 PM 11/12/1992 6:09 PM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1991 3/27/1991 10:16 AM 9/17/1991 12:24 PM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1990 3/26/1990 7:15 AM 7/23/1990 8:27 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1989 3/25/1989 12:48 PM 7/27/1989 6:49 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.
1988 3/25/1988 1:28 PM 7/18/1988 11:40 AM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/21/2024
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
4/17/2024 11:45:00 AM GMC

Checked and tuned transceivers. No issues were discovered during this check

4/14/2024 11:16:40 AM ErrorsCleared Short noise events.
4/9/2024 12:00:00 PM GMC

PSMFC was on site to perform a GMC as well as address the comms issue with transceiver A2. The spare jumper from enclosure 07/08 was used and verified from PITtag room to the fiber coming from the diffuser room and still cannot send commands but am receiving data. We will need to address this next week when we can have someone on the other end of the diffuser room fiber to verify pairs to try. No other issues were discovered during this check.

4/9/2024 12:00:00 PM GMC

Checked and tuned transceivers. No issues were discovered during this check.

4/3/2024 7:12:57 AM ErrorsCleared Noted.
4/2/2024 11:20:00 AM GMC

All transceivers were checked for tuning and noise. No issues were discovered during this check.

3/27/2024 11:00:00 AM GMC

On site for the initial weekly gate check for the season. All pressure was checked to see where it was set for the season. All gates were set to 75 PSI by the site and the gates were tuned to this pressure setting. After checking the travel of all gates, the soft close valve and the timing of the gates were adjusted for optimal travel. Sticks were dropped with 100% accuracy for diverting the sticks. The system is ready for the season.

3/26/2024 1:00:00 PM GMC

Site GMC. No issues discovered.

3/25/2024 9:40:00 AM General

Caled Startouch and they say it looks like a power problem or the radio is dead facing the upstream tower.  Called the LGR office and left message regarding power status near and around the lock gate booth. They was a UPS down woth the ST equipment but I think we removed it because it was old and not working but wud have confirm this. 

Star touch is looking into this also , More status when available

3/25/2024 9:40:00 AM General

Caled Startouch and they say it looks like a power problem or the radio is dead facing the upstream tower.  Called the LGR office and left message regarding power status near and around the lock gate booth. They was a UPS down woth the ST equipment but I think we removed it because it was old and not working but wud have confirm this. 

Star touch is looking into this also , More status when available

3/25/2024 9:00:00 AM General

I was able to confirm with Site personnel that there was a power event that impacted the Navigational lock and our Startouch equipment. 

3/18/2024 9:12:00 AM SiteUp
3/18/2024 9:11:00 AM SiteUp
3/18/2024 8:00:00 AM General

Deployed SbyC monitor mode protocols to M5 machines with tag codes from four SbyC projects with project numbers: 2648, 2654, 2646, and 2651.

2/21/2024 1:07:43 PM TASS Enabled
2/21/2024 1:07:03 PM TASS Enabled
2/21/2024 1:06:42 PM TASS Enabled
2/21/2024 12:45:14 PM ErrorsCleared Noted.
2/21/2024 7:08:00 AM General

PSMFC was on site to finish up the installation of the new Flume antennas. These antennas are the new Sample monitor and the ID's are the 51 and 52. This replaces the old sample monitor which was 51, 52, and 53.

2/20/2024 12:34:07 PM ErrorsCleared Noted.
12/20/2023 3:30:00 PM General

The 6.5-hour file gap on 12/20/2023 is inconsequential as the bypass facility and full flow are dewatered for the season.

12/20/2023 9:20:00 AM General

This site is without communications due to the replacement of a distribution panel in the GRJ PIT Tag Room. This is scheduled work by the COE. The panel powers the ISP link to internet.

12/20/2023 9:20:00 AM General

This site is without communications due to the replacement of a distribution panel in the GRJ PIT Tag Room. This is scheduled work by the COE. The panel powers the ISP link to internet.

12/15/2023 8:57:00 AM General

All transceiver buffers were cleared the week of 12/11/2023.

12/14/2023 9:00:00 AM SiteDown

Full Flow is down.